Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint

被引:23
作者
Aubry, A. [1 ]
Rossi, A. [2 ]
Espinouse, M. -L. [1 ]
Jacomino, A. [1 ]
机构
[1] LAG, F-38402 St Martin Dheres, France
[2] LESTER, F-56321 Lorient, France
关键词
setup costs; assignment constraints; machines configuration; parallel multi-purpose machines;
D O I
10.1016/j.ejor.2006.05.050
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This article focuses on the minimization of the setup costs of a workshop modeled with parallel multi-purpose machines. Any admissible workshop configuration has to ensure that a load-balanced production plan meeting a given demand exists. This problem is shown to be NP-hard in the strong sense, and is stated as a mixed integer linear program. It is shown that under some hypotheses, it can be stated as a transportation problem and solved in polynomial time. An upper bound and lower bound are proposed, as well as a performance ratio assessment that is reached only when degenerate optimal solutions to the transportation problem exist. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:1115 / 1125
页数:11
相关论文
共 11 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]  
ALLAHVERDI A, IN PRESS EUROPEAN J
[3]   Complexity of scheduling problems with multi-purpose machines [J].
Brucker, P ;
Jurisch, B ;
Kramer, A .
ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) :57-73
[4]  
Chvatal Vasek., 1980, LINEAR PROGRAMMING
[5]  
Garey MR, 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[6]  
Hoogeveen H, 2005, EUR J OPER RES, V167, P592, DOI 10.1016/j.ejor.2004.07.011
[7]   Automated stepper load balance allocation system [J].
Miwa, T ;
Nishihara, N ;
Yamamoto, K .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2005, 18 (04) :510-516
[8]   An affine scaling method with an infeasible starting point: Convergence analysis under nondegeneracy assumption [J].
Muramatsu, M ;
Tsuchiya, T .
ANNALS OF OPERATIONS RESEARCH, 1996, 62 :325-355
[9]  
ROSSI A, 2004, J EUROPEEN SYSTEMES, V34, P373
[10]  
T'kindt V., 2002, MULTICRITERIA SCHEDU