Prioritizing the solutions of lean implementation in SMEs to overcome its barriers An integrated fuzzy AHP-TOPSIS approach

被引:61
作者
Belhadi, Amine [1 ]
Touriki, Fatima Ezahra [2 ]
El Fezazi, Said [1 ]
机构
[1] Higher Sch Technol Safi, Ind Engn Res Team, Safi, Morocco
[2] Natl Sch Appl Sci Safi, Dept Ind Engn, Safi, Morocco
关键词
Lean production; TOPSIS; AHP; Small- and medium-sized enterprises; MULTICRITERIA DECISION-ANALYSIS; MEDIUM-SIZED ENTERPRISES; MANUFACTURING ENTERPRISES; PERFORMANCE EVALUATION; SUPPLY CHAIN; 6; SIGMA; MANAGEMENT; FRAMEWORK;
D O I
10.1108/JMTM-04-2017-0066
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The implementation of lean production in small manufacturing enterprises (SMEs) harbors a great deal of barriers on practical, theoretical, financial and organizational sides. In view of this, the purpose of this paper is to explore and prioritize the solutions to overcome these barriers and pitfalls in order to identify a list of the most feasible and efficient solutions on which SMEs must focus to success their lean journey. Design/methodology/approach - First, a review of the published articles along with the interview of some lean experts have allowed to identify 20 barriers grouped into five categories along with 17 solutions proposed to overcome these barriers. Afterwards, an integrated fuzzy Analytic Hierarchy Process-Technique for Order Preference by Similarity to Ideal Solution (AHP-TOPSIS) was proposed to evaluate and rank the solutions of lean implementation in SMEs and overcome its barriers. The AHP is used to determine weights of the barriers as criteria, and the fuzzy TOPSIS method is used to determine the final ranking of the solutions of lean adoption in SMEs. Findings - The top five barriers of lean implementation in SMEs were found to be: lack of management involvement, lack of adapted methodology of lean implementation, short-term vision, fear and resistance to change and lack of understanding of lean. Moreover, the top five solutions to overcome the barriers of lean adoption in SMEs are as follows: commitment and participation of management, adoption of simple measurement and KPIs, development of organizational learning culture, early deployment of lean culture through training and allocation of sufficient time and resources for change. Originality/value - The findings of this study can provide a basis for researchers and practitioners in order to understand the real reasons of lean failure in SMEs and develop improvement plans to increase its success rate. Moreover, it proposes a more reliable, robust and systematic decision support tool for stepwise implementation of the solutions of lean adoption in SMEs since they lack sufficient resources to address all the solutions simultaneously.
引用
收藏
页码:1115 / 1139
页数:25
相关论文
共 50 条
  • [11] Pythagorean fuzzy AHP-TOPSIS integrated approach for transportation management through a new distance measure
    Biswajit Sarkar
    Animesh Biswas
    Soft Computing, 2021, 25 : 4073 - 4089
  • [12] Pythagorean fuzzy AHP-TOPSIS integrated approach for transportation management through a new distance measure
    Sarkar, Biswajit
    Biswas, Animesh
    SOFT COMPUTING, 2021, 25 (05) : 4073 - 4089
  • [13] A fuzzy AHP-TOPSIS approach to supply partner selection in continuous aid humanitarian supply chains
    Venkatesh, V. G.
    Zhang, Abraham
    Deakins, Eric
    Luthra, Sunil
    Mangla, S.
    ANNALS OF OPERATIONS RESEARCH, 2019, 283 (1-2) : 1517 - 1550
  • [14] Prioritizing Load Break Switch Placement: Application of Fuzzy AHP-TOPSIS Approaches
    Sitohang, Nathan Saputra
    Irawan, Mohammad Isa
    Saragi, Hadi Sutanto
    Saragih, Akmaluddin
    Simanjuntak, Rikardo
    2023 IEEE 3RD INTERNATIONAL CONFERENCE IN POWER ENGINEERING APPLICATIONS, ICPEA, 2023, : 32 - 37
  • [15] Prioritizing and overcoming barriers to integrated management system (IMS) implementation using AHP and G-TOPSIS
    Ikram, Muhammad
    Sroufe, Robert
    Zhang, Qingyu
    JOURNAL OF CLEANER PRODUCTION, 2020, 254
  • [16] A new approach for selecting the most suitable oilseed for biodiesel production; the integrated AHP-TOPSIS method
    Abdulvahitoglu, Asli
    Kilic, Mustafa
    AIN SHAMS ENGINEERING JOURNAL, 2022, 13 (03)
  • [17] A combined AHP and TOPSIS approach for prioritizing the attributes for successful implementation of agile manufacturing
    Kumar, Rahul
    Singh, Kanwarpreet
    Jain, Sanjiv Kumar
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2020, 69 (07) : 1395 - 1417
  • [18] Evaluating the strategies for sustainable energy planning in Pakistan: An integrated SWOT-AHP and Fuzzy-TOPSIS approach
    Solangi, Yasir Ahmed
    Tan, Qingmei
    Mirjat, Nayyar Hussain
    Ali, Sharafat
    JOURNAL OF CLEANER PRODUCTION, 2019, 236
  • [19] Prioritizing CSR barriers in the Indian Service Industry: A Fuzzy AHP Approach
    Kumar, Divesh
    Goyal, Praveen
    Kumar, Vinod
    SCIENTIFIC ANNALS OF ECONOMICS AND BUSINESS, 2019, 66 (02) : 213 - 233
  • [20] Stakeholders' perspective towards employability: a hybrid fuzzy AHP-TOPSIS Approach
    Bhattacherjee, Abhishek
    Kukreja, Vinay
    Aggarwal, Arun
    EDUCATION AND INFORMATION TECHNOLOGIES, 2024, 29 (02) : 2157 - 2181