A new approximation algorithm for unrelated parallel machine scheduling with release dates

被引:8
|
作者
Pei, Zhi [1 ]
Wan, Mingzhong [1 ,2 ]
Wang, Ziteng [2 ]
机构
[1] Zhejiang Univ Technol, Dept Ind Engn, Hangzhou, Peoples R China
[2] Northern Illinois Univ, Dept Ind & Syst Engn, De Kalb, IL 60115 USA
基金
中国国家自然科学基金;
关键词
Unrelated parallel machine scheduling; Release dates; Semi-definite programming; Approximation algorithm; Branch and bound; WEIGHTED COMPLETION-TIME; MINIMIZE; RELAXATIONS; JOBS; HEURISTICS;
D O I
10.1007/s10479-019-03346-4
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the current study, an unrelated parallel machine scheduling problem with release dates is considered, which is to obtain a job assignment with minimal sum of weighted completion times. Although this problem is NP-hard in the strong sense, which renders the optimality seeking a formidable task within polynomial time, a 4-approximation algorithm based on the constant worst-case bound is devised and proved in comparison with the existing 16/3-approximation (Hall et al. in Math Oper Res 22(3):513-544, 1997). In the newly proposed algorithm, the original scheduling problem is divided into several sub-problems based on release dates. For each sub-problem, a convex quadratic integer programming model is constructed in accordance with the specific problem structure. Then a semi-definite programming approach is implemented to produce a lower bound via the semi-definite relaxation of each sub-problem. Furthermore, by considering the binary constraint, a branch and bound based method and a local search strategy are applied separately to locate the optimal solution of each sub-problem. Then the solution of the original scheduling problem is derived by integrating the outcomes of the sub-problems via the proposed approximation algorithm. In the numerical analysis, it is discovered that the proposed methods could always obtain a scheduling result within 1% of the optimal solution. And an asymptotic trend could be observed where the quality of solutions improves even further as the scale of the scheduling problem increases.
引用
收藏
页码:397 / 425
页数:29
相关论文
共 50 条
  • [21] ACO algorithm for scheduling complex unrelated parallel machine
    Liu, Guobao
    Zhu, Qiong
    Zhang, Jie
    COMPUTATIONAL MATERIALS SCIENCE, PTS 1-3, 2011, 268-270 : 297 - 302
  • [22] Exact and metaheuristic approaches for unrelated parallel machine scheduling
    Moser, Maximilian
    Musliu, Nysret
    Schaerf, Andrea
    Winter, Felix
    JOURNAL OF SCHEDULING, 2022, 25 (05) : 507 - 534
  • [24] Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
    Bank, J
    Werner, F
    MATHEMATICAL AND COMPUTER MODELLING, 2001, 33 (4-5) : 363 - 383
  • [25] An approximation algorithm for parallel machine scheduling with a common server
    Wang, GQ
    Cheng, TCE
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (02) : 234 - 237
  • [26] Imperialist competitive algorithm for unrelated parallel machine scheduling with sequence-and-machine-dependent setups and compatibility and workload constraints
    Elyasi, Milad
    Selcuk, Yagmur Selenay
    Ozener, O. Orsan
    Coban, Elvin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 190
  • [27] Single machine scheduling with release dates
    Goemans, MX
    Queyranne, M
    Schulz, AS
    Skutella, M
    Wang, YG
    SIAM JOURNAL ON DISCRETE MATHEMATICS, 2002, 15 (02) : 165 - 192
  • [28] Unrelated parallel machine scheduling with new criteria: Complexity and models
    Bitar, Abdoul
    Dauzere-Peres, Stephane
    Yugma, Claude
    COMPUTERS & OPERATIONS RESEARCH, 2021, 132
  • [29] UNRELATED PARALLEL MACHINE SCHEDULING WITH SEQUENCE- AND MACHINE-DEPENDENT SETUP TIMES AND DUE DATE CONSTRAINTS
    Ying, Kuo-Ching
    Lin, Shih-Wei
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2012, 8 (5A): : 3279 - 3297
  • [30] APPROXIMATION ALGORITHMS FOR SCHEDULING UNRELATED PARALLEL MACHINES
    LENSTRA, JK
    SHMOYS, DB
    TARDOS, E
    MATHEMATICAL PROGRAMMING, 1990, 46 (03) : 259 - 271