TECHNOLOGY ACCEPTANCE MODEL FOR BUILDING INFORMATION MODELLING BASED VIRTUAL REALITY (BIM-VR) IN COST ESTIMATION

被引:4
作者
Lee, Minghui [1 ]
Chai, Changsaar [1 ]
Xiong, Yaoli [1 ]
Gui, Hunchuen [2 ]
机构
[1] Swinburne Univ Technol, Fac Engn Comp & Sci, Sarawak Campus, Sarawak, Malaysia
[2] Univ Malaysia Sarawak, Fac Built Environm, Sarawak, Malaysia
来源
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION | 2022年 / 27卷
关键词
Cost Estimation; Building Information Modelling; Virtual Reality; Technology Acceptance Model;
D O I
10.36680/j.itcon.2022.044
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The accuracy of cost estimation during the preliminary stage of a construction project is imperative. However, owing to limited accessibility of information, the level of accuracy required at this stage of a project is extremely difficult to be attained. In like manner, the risks of budget shortages or cost overruns are likely to surge exponentially due to an incompetent or a lackadaisical approach towards life-cycle costing. Hence, this study proposes BIM-based VR as a preliminary estimating solution which is purported to nip the aforementioned issues in the bud. BIM-VR enables BQ to be updated automatically as stakeholders performs modifications on-the-go, allowing speedy and highly accurate design adjustments throughout the project. On this front, the Technology Acceptance Model (TAM) was adopted to determine the acceptance level of BIM-based VR technology in Malaysia. Data was acquired via a questionnaire survey, of which 92 out of 180 distributions were accepted for analysis, accounting to a respectable response rate of 51%. Consequentially, Principal Component Analysis result revealed that 'Saving Cost and Resources' is the most significant factor for BIM acceptance. Conversely, 'Presence of Skill Gap' was found to be the biggest stumbling block for BIM-based VR in cost estimation. Relationship analysis from the TAM also unveiled that the challenges of BIM-based VR did not produce mediating effect towards attitude and intention to use. This implies that the intention of construction professionals to adopt the technology wasn't impeded by its challenges. Significantly, this study served as a benchmark in uncovering new possibilities of BIM and VR in project cost management, where the reliability and accuracy of conventional procurement can be enhanced with technology, particularly in BQ documentation, to fulfill the rising expectations of construction stakeholders across the globe.
引用
收藏
页码:914 / 925
页数:12
相关论文
共 50 条
[21]   Virtual reality technology in construction safety training: Extended technology acceptance model [J].
Zhang, Ming ;
Shu, Lei ;
Luo, Xiaowei ;
Yuan, Mengqi ;
Zheng, Xiazhong .
AUTOMATION IN CONSTRUCTION, 2022, 135
[22]   Impacts of the inclusion of Virtual Reality in the jeweler manufacturing process based on the BIM concept (Building Information Modeling) [J].
de Abreu Freire, Antonio Leonardo .
2017 19TH SYMPOSIUM ON VIRTUAL AND AUGMENTED REALITY (SVR), 2017, :195-199
[23]   An extended technology acceptance model on immersive virtual reality use with primary school students [J].
Villena-Taranilla, Rafael ;
Cozar-Gutierrez, Ramon ;
Gonzalez-Calero, Jose Antonio ;
Diago, Pascual D. .
TECHNOLOGY PEDAGOGY AND EDUCATION, 2023, 32 (03) :367-388
[24]   Augmented Reality and Virtual Reality for Learning: An Examination Using an Extended Technology Acceptance Model [J].
Jang, Jaehong ;
Ko, Yujung ;
Shin, Won Sug ;
Han, Insook .
IEEE ACCESS, 2021, 9 :6798-6809
[25]   Accepting virtual reality for dynamic learning: an extension of the technology acceptance model [J].
Fussell, Stephanie G. ;
Truong, Dothang .
INTERACTIVE LEARNING ENVIRONMENTS, 2023, 31 (09) :5442-5459
[26]   Building Information Modelling Technological Innovations in Industrialised Building Systems Cost Estimation [J].
Moledina, Mohamed Murteza Gulamhussein ;
Pin, Goh Wei ;
Enegbuma, Wallace Imoudu ;
Ali, Kherun Nita ;
Adenuga, Kayode .
2017 5TH INTERNATIONAL CONFERENCE ON RESEARCH AND INNOVATION IN INFORMATION SYSTEMS (ICRIIS 2017): SOCIAL TRANSFORMATION THROUGH DATA SCIENCE, 2017,
[27]   BIM and ontology-based approach for building cost estimation [J].
Lee, Seul-Ki ;
Kim, Ka-Ram ;
Yu, Jung-Ho .
AUTOMATION IN CONSTRUCTION, 2014, 41 :96-105
[28]   Integrating building information modelling (BIM) and extended reality (XR) in the transportation infrastructure industry [J].
Alhady, Ahmed ;
Alanany, Mohamed ;
Khodair, Yasser ;
Salem, Shady ;
El Maghraby, Yosra .
ADVANCES IN BRIDGE ENGINEERING, 2024, 5 (01)
[29]   Validation of technology acceptance model for virtual reality usage in collaborative learning to enhance learner performance [J].
Guo, Huifen ;
Ma, Fenggi ;
Zhou, Zhen .
INNOVATIONS IN EDUCATION AND TEACHING INTERNATIONAL, 2025, 62 (02) :429-443
[30]   Design of virtual reality cycling intelligent interaction system based on VR technology [J].
Jiang X. .
International Journal of Product Development, 2023, 27 (1-2) :96-110