共 46 条
- [33] Algebraic Solution to Optimal Scheduling Problems Taking into Account the Scheduled Start Time of Jobs in Projects Vestnik St. Petersburg University, Mathematics, 2022, 55 : 389 - 395
- [35] Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization Journal of Scheduling, 2015, 18 : 285 - 298
- [37] The PDBO Algorithm for Discrete Time, Cost and Quality Trade - off in Software Projects with Expressing Quality by Defects INTERNATIONAL CONFERENCE ON COMMUNICATIONS, MANAGEMENT, AND INFORMATION TECHNOLOGY (ICCMIT'2015), 2015, 65 : 930 - 939
- [38] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
- [39] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207