Optimal segmentation of projects - Schedule and cost considerations

被引:3
|
作者
Shtub, A [1 ]
Raz, T
机构
[1] TEL AVIV UNIV, SCH ENGN, DEPT IND ENGN, IL-69978 TEL AVIV, ISRAEL
[2] LEON E RECANATI GRAD SCH BUSINESS ADM RAMAT AVIV, FAC MANAGEMENT, IL-69978 TEL AVIV, ISRAEL
关键词
project segmentation; project scheduling; project control; project planning;
D O I
10.1016/0377-2217(95)00260-X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In certain types of projects, the same sequence of activities is performed throughout the various physical parts of the project (e.g., road construction). By dividing the project into segments and working in parallel, the duration of the project can be reduced, with a resulting increase in direct costs. in this paper we consider the problem of finding the optimal number of segments that minimizes total project cost, for linear cost and duration functions. We begin by formulating and solving a mathematical programming model for homogeneous projects, and, by using the concept of work contents, we extend the solution to non-homogeneous projects.
引用
收藏
页码:278 / 283
页数:6
相关论文
共 46 条
  • [21] Analysis of duration and cost estimate of construction projects through computer simulation
    Dukic, Darko
    Maric, Tamara
    Babic, Dubravka
    PROCEEDINGS OF THE ITI 2007 29TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY INTERFACES, 2007, : 107 - +
  • [22] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149
  • [23] Robust Design for Optimal Project Management with Reliability and Cost
    Jeang, A.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1809 - 1813
  • [24] Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
    Olawale, Yakubu Adisa
    Sun, Ming
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (05) : 509 - 526
  • [25] A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks
    Unsal-Altuncan, Izel
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 511 - 527
  • [26] Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result
    Trietsch, D
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (04) : 627 - 637
  • [27] Optimal Scheduling and Allocation for IC Design Management and Cost Reduction
    Agrawal, Prabhav
    Broxterman, Mike
    Chatterjee, Biswadeep
    Cuevas, Patrick
    Hayashi, Kathy H.
    Kahng, Andrew B.
    Myana, Pranay K.
    Nath, Siddhartha
    ACM TRANSACTIONS ON DESIGN AUTOMATION OF ELECTRONIC SYSTEMS, 2017, 22 (04)
  • [28] Using Genetic Algorithms for Optimizing and Modelling Time, Cost and Quality Trade Offs of Construction Projects
    Bragadin, Marco A.
    Ballabeni, Andrea
    Kahkonen, Kalle
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2018, 9 (13): : 200 - 207
  • [29] A Data Envelopment Analysis Method for Finding Robust and Cost-Efficient Schedules in Multimode Projects
    Schmidt, Klaus Werner
    Hazir, Oncu
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2020, 67 (02) : 414 - 429
  • [30] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)