共 46 条
- [1] A robust scheduling of projects with time, cost, and quality considerations The International Journal of Advanced Manufacturing Technology, 2012, 60 : 631 - 642
- [8] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
- [10] EVM Application in a Pipeline Project: Cost and New Schedule Control WWAI '08: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON WASTE MANAGEMENT, WATER POLLUTION, AIR POLLUTION, INDOOR CLIMATE, 2008, : 63 - 70