A heuristic to schedule flexible job-shop in a glass factory

被引:57
作者
Alvarez-Valdes, R [1 ]
Fuertes, A
Tamarit, JM
Giménez, G
Ramos, R
机构
[1] Univ Valencia, Dept Stat & Operat Res, E-46003 Valencia, Spain
[2] Univ Valencia, Inst Robot, E-46003 Valencia, Spain
[3] DATADEC, Valencia, Spain
关键词
scheduling; job shop; production; heuristics; operation synchronization; overlapping;
D O I
10.1016/j.ejor.2004.04.020
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We describe the design and implementation of a scheduling system in a glass factory. The factory produces a large variety of manufactured glass objects in a complex process ranging from melting the glass in the furnaces and blowing it automatically or manually to decorating, assembling and packing it. The structure basically corresponds to a flexible job-shop scheduling problem with some special characteristics. On the one hand, dealing with hot liquid glass imposes no-wait constraints on some operations. On the other hand, skilled workers performing some manual tasks are modelled as special machines. The system produces approximate solutions in very short computing times, trying to minimize a non-regular criterion defined by the user and based on due dates. It can be used to establish delivery dates for new customer orders, taking into account current machine workloads, or to schedule a set of orders, trying to meet given customer due dates. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:525 / 534
页数:10
相关论文
共 20 条
[1]   2 NEW RULES TO MINIMIZE TARDINESS IN A JOB SHOP [J].
ANDERSON, EJ ;
NYIRENDA, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (12) :2277-2292
[2]  
BAKER KR, 1982, J OPER MANAG, V3, P37, DOI DOI 10.1016/0272-6963(82)90020-1
[3]  
Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
[4]   An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search [J].
DauzerePeres, S ;
Paulli, J .
ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) :281-306
[5]  
Demeulemeester E. L., 2002, Project scheduling: A research handbook
[6]   Sequencing of jobs in some production system [J].
Grabowski, J ;
Pempera, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 125 (03) :535-550
[7]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525
[8]   Efficient dispatching rules for scheduling in a job shop [J].
Holthaus, O ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) :87-105
[9]  
HURINK J, 1994, OR SPEKTRUM, V15, P205, DOI 10.1007/BF01719451
[10]   Extending the shifting bottleneck procedure to real-life applications [J].
Ivens, P ;
Lambrecht, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :252-268