共 50 条
- [22] A 0-1 linear programming approach to optimal phasor measurement units placement considering maximized system observability redundancy Bao, Wei, 1600, Power System Technology Press (38):
- [26] A two-phase model of collective memory decay with a dynamical switching point SCIENTIFIC REPORTS, 2022, 12 (01):
- [29] Optimal Transmission Switching Model Considering Short-Circuit Current Limitation and a Heuristic Algorithm Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2019, 53 (09): : 102 - 109
- [30] Optimal decay rates of a nonconservative compressible two-phase fluid model ZAMM-ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 2023, 103 (08):