Empirical Study of BIM Implementation-Based Perceptions among Chinese Practitioners

被引:86
作者
Jin, Ruoyu [1 ]
Hancock, Craig [2 ]
Tang, Llewellyn [1 ]
Chen, Chao [1 ]
Wanatowski, Dariusz [3 ]
Yang, Lin [4 ]
机构
[1] Univ Nottingham Ningbo China, Dept Architecture & Built Environm, 199 Taikang East Rd, Ningbo 315100, Zhejiang, Peoples R China
[2] Univ Nottingham Ningbo China, Dept Civil Engn, 199 Taikang East Rd, Ningbo 315100, Zhejiang, Peoples R China
[3] Univ Leeds, SWJTU Leeds Joint Sch, Leeds LS2 9JT, W Yorkshire, England
[4] Shanghai BIM Engn Ctr SBEC, Lujiazui Software Pk, Shanghai 200120, Peoples R China
关键词
Building information modeling; Architectural; engineering; and construction (AEC) industries; Interoperability; Subgroup differences; Statistical analysis; Developing countries;
D O I
10.1061/(ASCE)ME.1943-5479.0000538
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The global movement of building information modeling (BIM) is spreading the implementation of BIM from developed countries to other developing countries. Practitioners' perceptions of BIM implementation in these developing countries, such as China, a giant building market that is increasing the application of BIM in the industry, have not been thoroughly understood. This research used the questionnaire method to survey 94 randomly recruited Chinese BIM professionals to investigate BIM practice and its related perceptions. Reductions in design errors and resultant construction rework were considered the top benefits of using BIM. The most important factor in achieving BIM value was noted as interoperability among various BIM tools. A comprehensive evaluation of BIM at the company level was considered a major difficulty of implementing BIM. The owner was considered the party that received the most benefits from BIM. Subgroup differences based on two major categories (i.e., participants' profession and BIM proficiency level) were analyzed in the survey sections related to BIM implementation. Statistical analysis revealed that, generally, neither the profession nor BIM proficiency level affected participants' perceptions of the benefits, factors, challenges, or benefited parties in BIM implementation. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 58 条
[1]   Contractors' Transformation Strategies for Adopting Building Information Modeling [J].
Ahn, Yong Han ;
Kwak, Young Hoon ;
Suk, Sung Joon .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
[2]   Critical success factors influencing safety program performance in Thai construction projects [J].
Aksorn, Thanet ;
Hadikusumo, B. H. W. .
SAFETY SCIENCE, 2008, 46 (04) :709-727
[3]  
[Anonymous], P INT C COMP CIV BUI
[4]  
[Anonymous], E WORK E BUSINESS AR
[5]  
[Anonymous], BIM IMPLICATIONS GOV
[6]  
[Anonymous], PROJECT EXTRANETS E
[7]  
[Anonymous], 2014, BUSINESS VALUE BIM C
[8]  
[Anonymous], P ARCH ENG C AEI
[9]  
[Anonymous], P 30 ECAADE C
[10]  
[Anonymous], ANN 2014 INV REP CUR