Application of alternative dispute resolution in the field of construction projects

被引:2
作者
Yaskova, Natalia [1 ]
Zaitseva, Larisa [2 ]
机构
[1] Moscow State Univ Civil Engn, Yaroslavskoe Shosse 26, Moscow 129337, Russia
[2] Tenth Arbitrat Court Appeal Moscow, Sadovnicheskaya D 68-70,Str 1, Moscow 117997, Russia
来源
ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017) | 2017年 / 90卷
关键词
D O I
10.1088/1755-1315/90/1/012182
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The article deals with the features of the Russian Federation legal system that do not allow to fully bring into effect the potential of the out-of-court dispute resolution due to the specific nature of contracts and subject composition of legal relations, especially in the field of construction projects. Examples of these methods are analyzed on the basis of the experience of foreign countries, suggestions for their development are stated, and types of disputes are studied, within which abuse of rights in contractual obligations is possible.
引用
收藏
页数:4
相关论文
共 5 条
[1]  
Arseniev D.G., 2014, APPL MECH MAT, V635-637, P2076
[2]  
Latham M., 1994, IND REV PROCUREMENT
[3]  
Poole J, 2010, CASEBOOK CONTRACT LA
[4]   Methods of determining the optimal project of reconstruction of The Petrovsky Dock in Kronstadt [J].
Romanovich, Marina ;
Vilinskaya, Anna .
INTERNATIONAL SCIENTIFIC CONFERENCE WEEK OF SCIENCE IN SPBPU - CIVIL ENGINEERING (SPBWOSCE-2015), 2016, 53
[5]  
Tas Elcin, 2015, ITU J FACULTY ARCH, V12, P187