Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects

被引:36
作者
Saxe, Shoshanna [1 ]
Guven, Gursans [1 ]
Pereira, Lucas [1 ]
Arrigoni, Alessandro [1 ]
Opher, Tamar [1 ]
Roy, Adrien [1 ]
Arceo, Aldrick [1 ]
Von Raesfeld, Sofia Sampedro [1 ]
Duhamel, Mel [1 ]
McCabe, Brenda [1 ]
Panesar, Daman K. [1 ]
MacLean, Heather L. [1 ]
Posen, I. Daniel [1 ]
机构
[1] Univ Toronto, Dept Civil & Mineral Engn, Toronto, ON M5S 1A4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
life cycle assessment; uncertainty; infrastructure; GREENHOUSE-GAS EMISSIONS; BUILDING CONSTRUCTION; EMBODIED CARBON; MODEL UNCERTAINTY; MATERIAL STOCK; GHG EMISSIONS; ENERGY; LCA; IMPACTS; DESIGN;
D O I
10.1088/1748-9326/ab85f8
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Environmental life cycle assessment (LCA) is increasingly being used to evaluate infrastructure products and to inform their funding, design and construction. As such, recognition of study limitations and consideration of uncertainty are needed; however, most infrastructure LCAs still report deterministic values. Compared to other LCA subfields, infrastructure LCA has developed relatively recently and lags in adopting uncertainty analysis. This paper presents four broad categories of infrastructure LCA uncertainty. These contain 11 drivers focusing on differences between infrastructure and manufactured products. Identified categories and drivers are: application of ISO 14040/14044 standards (functional unit, reference flow, boundaries of analysis); spatiotemporal realities underlying physical construction (geography, local context, manufacturing time); nature of the construction industry (repetition of production, scale, and division of responsibilities); and characteristics of infrastructure projects (agglomeration of other products, and recurring embodied energy). Infrastructure products are typically large, one-off projects with no two being exactly alike in terms of form, function, temporal or spatial context. As a result, strong variability between products is the norm and much of the uncertainty is irreducible. Given the inability to make significant changes to an infrastructure project ex-post and the unique nature of infrastructure, ex-ante analysis is of particular importance. This paper articulates the key drivers of infrastructure specific LCA uncertainty laying the foundation for future refinement of uncertainty consideration for infrastructure. As LCA becomes an increasingly influential tool in decision making for infrastructure, uncertainty analysis must be standard practice, or we risk undermining the fundamental goal of reduced real-world negative environmental impacts.
引用
收藏
页数:22
相关论文
共 180 条
  • [1] Life Cycle Greenhouse Gas Emissions From US Liquefied Natural Gas Exports: Implications for End Uses
    Abrahams, Leslie S.
    Samaras, Constantine
    Griffin, W. Michael
    Matthews, H. Scott
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2015, 49 (05) : 3237 - 3245
  • [2] Ahn C., 2010, P INT C COMP CIV BUI, P1
  • [3] LESSONS LEARNED FROM UTILIZING DISCRETE-EVENT SIMULATION MODELING FOR QUANTIFYING CONSTRUCTION EMISSIONS IN PRE-PLANNING PHASE
    Ahn, Changbum
    Pan, Wenjia
    Lee, SangHyun
    Pena-Mora, Feniosky A.
    [J]. PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 3170 - 3176
  • [4] Importance of Operational Efficiency to Achieve Energy Efficiency and Exhaust Emission Reduction of Construction Operations
    Ahn, Changbum R.
    Lee, SangHyun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (04) : 404 - 413
  • [5] Alexander MG, 2010, INT J ADV ENG SCI AP, V2, P95, DOI 10.1007/s12572-011-0027-x
  • [6] Amtmann M, 2010, REFERENCE BUILDINGS
  • [7] [Anonymous], 2007, Measuring Overcrowding in Housing p, P38
  • [8] [Anonymous], 2019, TD FUTURE CITIES CTR
  • [9] [Anonymous], 2011, WALL STREET J
  • [10] [Anonymous], 2011, 159782011 BSI BS EN