An effective neighborhood search algorithm for scheduling a flow shop of batch processing machines

被引:17
作者
Lei, Deming [1 ]
Wang, Tao [1 ]
机构
[1] Wuhan Univ Technol, Sch Automat, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Neighborhood search; Flow shop scheduling; Batch processing machines; Permutation; MINIMIZING MAKESPAN; FORMULATION;
D O I
10.1016/j.cie.2011.05.005
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers scheduling problem of flow shop with many batch processing machines and objective of maximum lateness. An effective neighborhood search algorithm (NSA) is proposed for the problem, in which a job permutation and a batch permutation are used to indicate the solution of two sub-problems, respectively. Each job permutation consists of several family-permutations for the representation of jobs from the same family. Two swaps are applied to two permutations to produce new solutions. NSA is applied to a number of instances and compared with some methods, and computational results validate the good performance of NSA. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:739 / 743
页数:5
相关论文
共 13 条
[1]   Hybrid flow shop scheduling with parallel batching [J].
Amin-Naseri, Mohammad Reza ;
Beheshti-Nia, Mohammad Ali .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (01) :185-196
[2]   Mixed integer formulation to minimize makespan in a flow shop with batch processing machines [J].
Damodaran, P ;
Srihari, K .
MATHEMATICAL AND COMPUTER MODELLING, 2004, 40 (13) :1465-1472
[3]  
Graham R. L., 1979, Discrete Optimisation, P287
[4]   An improved mixed integer linear formulation and lower bounds for minimizing makespan on a flow shop with batch processing machines [J].
Kashan, Ali Husseinzadeh ;
Karimi, Behrooz .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (5-6) :582-594
[5]   Variable neighbourhood search for minimising tardiness objectives on flow shop with batch processing machines [J].
Lei, Deming ;
Guo, XiuPing .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (02) :519-529
[6]  
LEI DM, 2010, P 8 WORLD C INT CONT, P694
[7]  
LIAO LM, COMPUTERS I IN PRESS
[8]   Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing [J].
Manjeshwar, Praveen Kumar ;
Damodaran, Purushothaman ;
Srihari, Krishnaswami .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2009, 25 (03) :667-679
[9]   Flow shop scheduling with two batch processing machines and nonidentical job sizes [J].
Mirsanei, H. S. ;
Karimi, B. ;
Jolai, F. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (5-6) :553-572
[10]   Makespan minimization in a no-wait flow shop problem with two batching machines [J].
Oulamara, Ammar .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (04) :1033-1050