Application of transformer heavy load and overload analysis and management system

被引:0
作者
Fan Qiang [1 ]
Chen Yuanyuan [2 ]
Wen Yi [1 ]
Lv Qiansu [1 ]
Xiao Ning [4 ]
Zhang Xun [1 ]
Wan Jinjin [3 ]
机构
[1] Guizhou Power Grid Co LTD, Power Sci Res Inst, Guiyang 550002, Guizhou, Peoples R China
[2] Guizhou Univ, Guiyang 550025, Guizhou, Peoples R China
[3] Guizhou Chuangxing Elect Power Res Inst Co LTD, Guiyang 550081, Guizhou, Peoples R China
[4] Guizhou Power Grid Co LTD, Guiyang 550002, Guizhou, Peoples R China
来源
2020 INTERNATIONAL SYMPOSIUM ON ENERGY ENVIRONMENT AND GREEN DEVELOPMENT | 2021年 / 657卷
关键词
D O I
10.1088/1755-1315/657/1/012097
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In recent years, with the development of China's economy and society, the social electricity consumption increases rapidly. As a support for the development of the national economy, the scale of power grid has expanded. The load capacity of oil-immersed power transformer is an important safety and performance index. Limited load capacity or overload may cause a large area of power grid blackout. Therefore, it is necessary to analyze and control the transformer heavy load and overload.
引用
收藏
页数:6
相关论文
共 6 条
[1]  
He Jianzhang, 2017, POWER GRID TECHNOLOG, P2593
[2]  
He Jianzhang, 2017, POWER GRID TECHNOLOG, V041, P290
[3]  
Shi Chang-kai, 2016, Journal of Electric Power Science and Technology, V31, P140
[4]  
Sun Ming, 2013, HYDROELECTRIC ENERGY, P193
[5]  
Yang Qiping, 2007, TRANSFORMERS, P50
[6]  
Zheng C., 2019, Electrical Measurement & Instrumentation, V56, P142