BIM-based augmented reality inspection and maintenance of fire safety equipment

被引:96
作者
Chen, Yi-Jao [1 ]
Lai, Yong-Shan [1 ]
Lin, Yen-Han [1 ]
机构
[1] Natl Univ Kaohsiung, Dept Architecture, 700 Kaohsiung Univ Rd, Kaohsiung 811, Taiwan
关键词
Augmented reality; Building information model; BIM; Fire safety equipment inspection and management; Mobil application; BUILDING INFORMATION; REQUIREMENTS;
D O I
10.1016/j.autcon.2019.103041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of fire safety equipment (FSE) inspection and maintenance is to ensure that this equipment is in good working condition during emergencies, so that fire damage could be kept to a minimum. At present, the maintenance and inspection of FSE must be performed according to the standards and methods specified by fire safety regulations, which makes it necessary to consult relevant files and drawings. However, the reading of maintenance and inspection information can be a very time-consuming endeavor as the majority of these files are in paper. To solve the aforementioned issues, building information modeling (BIM) was used in this study to construct the FSE elements so that the required information could be rapidly acquired by FSE inspectors. A cloud database for equipment inspection and maintenance was then generated by organizing the compiled information. This database was combined with the augmented reality (AR) technology to facilitate FSE inspection and maintenance using mobile devices, thus overcoming the constraints imposed by paper files on these tasks. The results of the demonstration and validation shown that the proposed BIM AR FSE system provides highly comprehensive, mobile, and effective access to FSE information. The combination of information and real-life objects via AR effectively facilitated the presentation of information in an immediate, visual, and convenient manner.
引用
收藏
页数:18
相关论文
共 50 条
[31]   BIM-based method to inform operation and maintenance phases through a simplified procedure [J].
Condotta, Massimiliano ;
Scanagatta, Chiara .
JOURNAL OF BUILDING ENGINEERING, 2023, 65
[32]   A Conceptual Framework for BIM-Based Site Safety Practice [J].
Hire, Shalaka ;
Sandbhor, Sayali ;
Ruikar, Kirti .
BUILDINGS, 2024, 14 (01)
[33]   Building defect inspection and data management using computer vision, augmented reality, and BIM technology [J].
Tan, Yi ;
Xu, Wenyu ;
Chen, Penglu ;
Zhang, Shuyan .
AUTOMATION IN CONSTRUCTION, 2024, 160
[34]   A BIM-Based Quality Inspection System Prototype for Temporary Construction Works [J].
Choi, Chang Hoon ;
Lee, Junbok .
BUILDINGS, 2022, 12 (11)
[35]   Investigating human and technological requirements for successful implementation of a BIM-based mobile augmented reality environment in facility management practices [J].
Gheisari, Masoud ;
Irizarry, Javier .
FACILITIES, 2016, 34 (1-2) :69-84
[36]   Engineering a BIM-Based Mixed Reality Application for the Life-Cycle Management of Buildings [J].
Stentoumis, Christos ;
Katsiokalis, Minas ;
Bikiris, Panagiotis ;
Karantakis, Nikos .
EXTENDED REALITY, PT I, XR SALENTO 2024, 2024, 15027 :240-248
[37]   Augmented Reality as a Didactic Resource: A Proposal for Computer Equipment Maintenance Training [J].
Banda, Fernando ;
Luna Lazaro, Martin ;
Neira-Tovar, Leticia ;
Luna Torres, Ana Karen ;
Gonzalez, Said .
ADVANCES IN MANUFACTURING III, VOL 2: PRODUCTION ENGINEERING: RESEARCH AND TECHNOLOGY INNOVATIONS, INDUSTRY 4.0, 2022, :253-266
[38]   Depth-informed point cloud-to-BIM registration for construction inspection using augmented reality [J].
Liu, Han ;
Liu, Donghai ;
Chen, Junjie .
ADVANCED ENGINEERING INFORMATICS, 2024, 62
[39]   Circular Economy and Virtual Reality in Advanced BIM-Based Prefabricated Construction [J].
O'Grady, Timothy M. ;
Brajkovich, Nicholas ;
Minunno, Roberto ;
Chong, Heap-Yih ;
Morrison, Gregory M. .
ENERGIES, 2021, 14 (13)
[40]   A Cloud-Based Mobile Augmented Reality Application for BIM Collaboration [J].
Dahbi, Aymane ;
Laaouan, Ikram ;
Hajji, Rafika ;
Ben Brahim, Youssef .
2022 THE 6TH INTERNATIONAL CONFERENCE ON VIRTUAL AND AUGMENTED REALITY SIMULATIONS, ICVARS 2022, 2022, :27-33