共 46 条
[11]
Grubbstrom R.W., 1967, MANAGE SCI, V13, P558, DOI [https://doi.org/10.1287/mnsc.13.7.558, DOI 10.1287/MNSC.13.7.558, 10.1287/mnsc.13.7.558]
[15]
Jacoby H. D., 2011, MIT JOINT PROGRAM SC, P1
[17]
Kandampully J., 2002, EUR J INNOV MANAG, V5, P18, DOI DOI 10.1108/14601060210415144
[20]
Simulation of personnel requirements during production ramp-up
[J].
PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT,
2012, 6 (4-5)
:395-402