Application of Tools of Quality Function Deployment and Modified Balanced Scorecard for Optimal Allocation of Pavement Management Resources

被引:10
作者
Sirin, Okan [1 ]
Gunduz, Murat [1 ]
Moussa, Abdullah [1 ]
机构
[1] Qatar Univ, Dept Civil & Architectural Engn, Doha, Qatar
来源
IEEE ACCESS | 2020年 / 8卷
关键词
Quality function deployment; Tools; Maintenance engineering; Industries; Organizations; Technological innovation; Roads; Pavement management; pavement perspectives; pavement condition; pavement management model; balanced score card; quality function deployment; CONSTRUCTION PROJECTS; ASSESSMENT MODEL; DECISION-MAKING; ROAD SAFETY; SYSTEM; DETERIORATION; OPTIMIZATION; STRATEGY; PERFORMANCE; ERROR;
D O I
10.1109/ACCESS.2020.2989096
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Pavement management is a set of tools used to evaluate and maintain pavements so that the pavements can be used safely and effectively over a certain period. Many traditional methods were and are still being used by entities related to pavement management to increase the efficiency of management in decision-making and in coordinating the different activities that have a direct impact on pavement systems. Most of the pavement management entities are driven by optimization models that allow the optimization of a single objective. There is no specific method that focuses on analyzing and prioritizing multiple pavement perspectives in view of financial goals. This paper aims to provide the pavement management sector with a new methodology that prioritizes various pavement perspectives in view of financial perspectives. This prioritization would lead to a better assessment of multiple pavement management goals. The quality function deployment (QFD) and balanced scorecard (BSC) were adopted and modified to achieve the study objectives. Consequently, the outcome of QFD-BSC analysis is studied in the Fishbone Diagram and Cause-Effect Analysis to graphically present how significant factors in four perspectives will lead to better financial goals in the pavement management industry. Prioritization of pavement goals would help better to allocate optimal resources by pavement management professionals.
引用
收藏
页码:76399 / 76410
页数:12
相关论文
共 74 条
  • [1] Integrated pavement management system with a Markovian prediction model
    Abaza, KA
    Ashur, SA
    Al-Khatib, IA
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2004, 130 (01): : 24 - 33
  • [2] Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques
    Al-Zwainy, Faiq M. S.
    Mezher, Reem Amer
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2018, 43 (04) : 2001 - 2012
  • [3] ROAD SAFETY AND PAVEMENT MANAGEMENT: A CASE STUDY OF TANZANIA
    Amador-Jimenez, Luis
    Afghari, Amir Pooyan
    [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2015, 10 (02): : 132 - 140
  • [4] Amarasiri S., 2020, J TRANSP ENG B, V146
  • [5] [Anonymous], 2012, IJTTE, DOI [DOI 10.7708/IJTTE.2012.2(4).01, 10.7708/ije2012.2(4).01, DOI 10.7708/IJE2012.2(4).01]
  • [6] Decision-Making Guideline for Preservation of Flexible Pavements in General Aviation Airport Management
    Arabali, Poura
    Sakhaeifar, Maryam S.
    Freeman, Thomas J.
    Wilson, Bryan T.
    Borowiec, Jeffrey D.
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING PART B-PAVEMENTS, 2017, 143 (02):
  • [7] Estimating transition probabilities in Markov chain-based deterioration models for management of wastewater systems
    Baik, HS
    Jeong, HS
    Abraham, DM
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2006, 132 (01) : 15 - 24
  • [8] Bardeesi M. W., 2015, Economic and Environmental Considerations for Pavement, V11, P171
  • [9] QUALICON: Computer-based system for construction quality management
    Battikha, MG
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (02): : 164 - 173
  • [10] Bektas F., 2014, RB14013 DOT