Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment

被引:17
作者
Anastasopoulos, Panagiotis Ch [1 ]
Labi, Samuel [2 ]
McCullouch, Bob G. [3 ]
Karlaftis, Matthew G. [4 ]
Moavenzadeh, Fred [2 ]
机构
[1] Purdue Univ, Ctr Rd Safety, W Lafayette, IN 47907 USA
[2] MIT, Cambridge, MA 02139 USA
[3] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
[4] Natl Tech Univ Athens, Zografos 15780, Greece
关键词
Construction planning; Contract management; Highway construction; Project management; Rehabilitation; COST; OPTIMIZATION;
D O I
10.1061/(ASCE)IS.1943-555X.0000035
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The selection of appropriate type of contract for a highway maintenance project can be influenced by project attributes such as the expected cost and duration. However, the expected project cost and planned duration depend on other project attributes and also depend on each other. These simultaneous relationships complicate the identification of the appropriate contract for a highway maintenance project. While previous research has provided insight into the factors that affect project cost and duration, the validity of the findings may have been stymied by a lack of explicit consideration of the simultaneous relationships between project duration and cost. In this paper, we develop a framework based on a three-stage least-squares model to identify the most appropriate type of contract given the project's attributes while explicitly accounting for the simultaneity between project cost and duration. The framework can also be used to estimate the expected contract duration and cost on the basis of the project type, constituent work activities, physical size (length) of the project, and contract type. The results suggest that the choice of the appropriate contract type for a highway maintenance project is influenced by characteristics such as the number of constituent maintenance activities in the contract, the expected or specified contract characteristics (contract duration, cost, and length), and the type of highway asset in question.
引用
收藏
页码:323 / 333
页数:11
相关论文
共 39 条
  • [1] Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations
    Anastasopoulos, Panagiotis Ch
    McCullouch, Bob G.
    Gkritza, Konstantina
    Mannering, Fred
    Sinha, Kumares C.
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2010, 16 (04) : 251 - 263
  • [2] ANASTASOPOULOS PC, 2007, THESIS PURDUE U W LA
  • [3] ANASTASOPOULOS PC, 2008, P 10 INT C APPL ADV
  • [4] [Anonymous], 1999, Applied Survival Analysis: Time-to-Event
  • [5] Time-cost optimization of construction projects with generalized activity constraints
    Chassiakos, AP
    Sakellaropoulos, SP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (10) : 1115 - 1124
  • [6] NONLINEAR TIME COST TRADEOFF MODELS IN PROJECT-MANAGEMENT
    DECKRO, RF
    HEBERT, JE
    VERDINI, WA
    GRIMSRUD, PH
    VENKATESHWAR, S
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (02) : 219 - 229
  • [7] CRITICAL PATH PROBLEMS WITH CONCAVE COST-TIME CURVES
    FALK, JE
    HOROWITZ, JL
    [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1972, 19 (04): : 446 - 455
  • [8] PERT AND CRASHING REVISITED - MATHEMATICAL GENERALIZATIONS
    FOLDES, S
    SOUMIS, F
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) : 286 - 294
  • [9] A NETWORK FLOW COMPUTATION FOR PROJECT COST CURVES
    FULKERSON, DR
    [J]. MANAGEMENT SCIENCE, 1961, 7 (02) : 167 - 178
  • [10] Goldberger A. S., 1991, COURSE ECONOMETRICS