Uncertainty and Activity Selection in New Product Development: An Experimental Study

被引:7
作者
Lasso, Sarah [1 ]
Cash, Philip [1 ]
Daalhuizen, Jaap [1 ]
Kreye, Melanie [1 ]
机构
[1] Danish Tech Univ, Tech Univ Denmark, DTU Management, DK-2800 Lyngby, Denmark
关键词
Uncertainty; Product development; Batteries; Task analysis; Organizations; Logic gates; Knowledge engineering; Activity selection; innovation; new product development; uncertainty; TECHNOLOGICAL UNCERTAINTY; FRONT-END; INFORMATION; KNOWLEDGE; DESIGN; INNOVATION; INTEGRATION; IMPACT; TRANSPORTATION; PERFORMANCE;
D O I
10.1109/TEM.2020.2989208
中图分类号
F [经济];
学科分类号
02 ;
摘要
Uncertainty drives project activity in new product development (NPD), and its resolution is crucial to project performance. However, there is a major gap in understanding the causal links between different uncertainty types and the project activities they trigger. Engineering managers lack guidance on how best to respond to different uncertainty types. We close this gap by experimentally contrasting responses to two uncertainty types central to NPD: technical and organizational uncertainty. We describe responses with respect to core engineering project activities: representation, information, and knowledge sharing. We present evidence from an experiment involving 50 professionals and 74 master's students. The results show that uncertainty type has a significant effect on activity response, and that there is a significant ordering effect within this response. Based on the identification of a new response type, change of situation, our findings show that technical uncertainty drives change of situation and representation activity, while organizational uncertainty drives information- and knowledge-sharing activities. This provides the basis for three main contributions of this article. First, we identify "change of situation" as a new type of response to uncertainty in NPD. Second, we describe different responses to technical and organizational uncertainty. Third, we characterize an ordering effect in responses to uncertainty.
引用
收藏
页码:1405 / 1416
页数:12
相关论文
共 89 条
[1]  
[Anonymous], 2009, SSRN Electronic Journal, DOI DOI 10.2139/SSRN.1498843
[2]  
[Anonymous], 2009, EXPT DESIGN
[3]   Potential problems in the statistical control of variables in organizational research: A qualitative analysis with recommendations [J].
Becker, TE .
ORGANIZATIONAL RESEARCH METHODS, 2005, 8 (03) :274-289
[4]  
Bedny G., 2005, Mind Culture and Activity, V12, P128, DOI [10.1207/s15327884mca1202_4, DOI 10.1207/S15327884MCA1202_4]
[5]   Activity theory as a basis for the study of work [J].
Bedny, GZ ;
Karwowski, W .
ERGONOMICS, 2004, 47 (02) :134-153
[6]   ASK FOR INFORMATION-RETRIEVAL .1. BACKGROUND AND THEORY [J].
BELKIN, NJ ;
ODDY, RN ;
BROOKS, HM .
JOURNAL OF DOCUMENTATION, 1982, 38 (02) :61-71
[7]   From the Editors: Student samples in international business research [J].
Bello, Daniel ;
Leung, Kwok ;
Radebaugh, Lee ;
Tung, Rosalie L. ;
van Witteloostuijn, Arjen .
JOURNAL OF INTERNATIONAL BUSINESS STUDIES, 2009, 40 (03) :361-364
[8]   Implementing the new product development process [J].
Bessant, J ;
Francis, D .
TECHNOVATION, 1997, 17 (04) :189-197
[9]   Flexibility, Structuration, and Simultaneity in New Product Development [J].
Biazzo, Stefano .
JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 2009, 26 (03) :336-353
[10]   A new orientation to deal with uncertainty in projects [J].
Boehle, Fritz ;
Heidling, Eckhard ;
Schoper, Yvonne .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) :1384-1392