Probabilistic Production Simulation of Multi-Energy System and Practice in Transnational Energy System

被引:0
作者
Lu, Runzhao [1 ]
Dai, Qian [1 ]
Chen, Dian [1 ]
Zhang, Libo [1 ]
机构
[1] China Elect Power Res Inst, Beijing, Peoples R China
来源
2022 12TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS, ICPES | 2022年
关键词
probabilistic production simulation; equivalent load duration curve; multi-energy systems;
D O I
10.1109/ICPES56491.2022.10073239
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Probabilistic production simulation is a powerful tool for power system planning and operation analysis. With the development of multi-energy systems, it has become an important way for energy supply to meet various types of loads (electrical, heating, cooling, etc.) from various types of power sources (thermal power, renewable energy, etc.). To adapt to this development trend, this paper extends the framework of probabilistic production simulation for single or interconnected multi-energy system. And then the framework is tested on self-built system and a real transnational energy system, the results demonstrate the effectiveness of the framework in electric energy arrangement and reliability evaluation.
引用
收藏
页码:917 / 922
页数:6
相关论文
共 8 条
[1]  
Feng J., 2017, Biostat. Epidemiol, DOI [DOI 10.1080/24709360.2017.1396742, 10.1080/24709360.2017.1396742]
[2]  
IRENA, 2019, Future of Wind: Deployment, Investment, Technology, Grid Integration and Socio-Economic Aspects, P1
[3]  
Ma H., 2019, J. Glob. Energy Interconnect., V2, P35
[4]  
Qu C., 2012, J XIAN JIAOTONG U, V46, P115
[5]  
[邵成成 Shao Chengcheng], 2021, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V41, P2029
[6]  
Wang X., 1994, MODERN POWER SYSTEM, V3rd
[7]   RELIABILITY MODELING OF LARGE WIND FARMS AND ASSOCIATED ELECTRIC UTILITY INTERFACE SYSTEMS [J].
WANG, XF ;
DAI, HZ ;
THOMAS, RJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (03) :569-575
[8]  
[姚力 Yao Li], 2015, [电网技术, Power System Technology], V39, P1219