Reliable scheduling of precedence-constrained tasks using a genetic algorithm

被引:0
作者
Dogan, A [1 ]
Özgüner, F [1 ]
机构
[1] Ohio State Univ, Dept Elect Engn, Columbus, OH 43210 USA
来源
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON PARALLEL AND DISTRIBUTED PROCESSING TECHNIQUES AND APPLICATIONS, VOLS I-V | 2000年
关键词
heterogeneous computing; matching and scheduling; precedence-constrained tasks; reliability; genetic algorithms;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper investigates the problem of reliable matching and scheduling of an application, which is composed of tasks with precedence constraints, in a heterogeneous distributed computing system. The reliable matching and scheduling problem is posed as finding a task assignment to minimize the probability of failure of the application. A cost function which defines this probability under a given task assignment is derived. Because the time complexity of the reliable matching and scheduling problem is exponential, to find optimal and suboptimal solutions efficiently, ct novel genetic algorithm is devised. The simulation results are provided to confirm the performance of the proposed genetic algorithm.
引用
收藏
页码:549 / 555
页数:7
相关论文
共 50 条
  • [21] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [22] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [23] A genetic algorithm for scheduling tasks in a real-time distributed system
    Monnier, Y
    Beauvais, JP
    Deplanche, AM
    [J]. 24TH EUROMICRO CONFERENCE - PROCEEDING, VOLS 1 AND 2, 1998, : 708 - 714
  • [24] A comparison of exact methods and genetic algorithm approach to resource constrained scheduling
    Seda, M
    [J]. PROCEEDINGS OF THE THIRD NORDIC WORKSHOP ON GENETIC ALGORITHMS AND THEIR APPLICATIONS (3NWGA), 1997, : 97 - 108
  • [25] Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
    Kim, Jin-Lee
    Ellis, Ralph D., Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (02) : 160 - 169
  • [26] DEVELOPMENT OF GENETIC ALGORITHM FOR SOLVING SCHEDULING TASKS IN FMS WITH COLOURED PETRI NETS
    Napalkova, Liana
    Merkuryeva, Galina
    Piera, Miquel A.
    [J]. INTERNATIONAL MEDITERRANEAN MODELLING MULTICONFERENCE 2006, 2006, : 135 - +
  • [27] Jop shop scheduling using genetic algorithm
    Cho, BJ
    Hong, SC
    Okoma, S
    [J]. CRITICAL TECHNOLOGY: PROCEEDINGS OF THE THIRD WORLD CONGRESS ON EXPERT SYSTEMS, VOLS I AND II, 1996, : 351 - 358
  • [28] A production scheduling problem using genetic algorithm
    Knosala, R
    Wal, T
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2001, 109 (1-2) : 90 - 95
  • [29] Bat algorithm for constrained optimization tasks
    Gandomi, Amir Hossein
    Yang, Xin-She
    Alavi, Amir Hossein
    Talatahari, Siamak
    [J]. NEURAL COMPUTING & APPLICATIONS, 2013, 22 (06) : 1239 - 1255
  • [30] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)