An investigation into the potential barriers facing the development of offshore wind energy in Scotland: Case study - Firth of Forth offshore wind farm

被引:57
作者
O'Keeffe, Aoife [1 ]
Haggett, Claire [1 ]
机构
[1] Univ Edinburgh, Edinburgh EH8 9YL, Midlothian, Scotland
关键词
Offshore wind; Economic viability; Renewables obligation; Feed-in tariff; Grid; Public acceptability; RENEWABLES; IMPLEMENTATION; OBLIGATION; DEPLOYMENT; POLICY;
D O I
10.1016/j.rser.2012.03.018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Scottish Executive has set ambitious targets of achieving 100% of electricity from renewable sources by 2020. As Scotland has the best offshore wind resources in Europe, the development of this energy source is crucial for reaching these targets. However, the development of offshore wind raises a number of issues related to economic viability, grid connection and public acceptability. This paper investigates these areas in greater depth, using a case study of the Firth of Forth offshore wind farm, in order to determine if these barriers can be overcome in time to make a valuable contribution to 2020 targets. Through interviews with relevant stakeholders, it emerged that there are various obstacles which are impeding progress in offshore wind development in Scotland. It became evident that stakeholder opposition, an inadequate renewable energy support mechanism, and the insufficient grid infrastructure off the Scottish coast are posing barriers, and hindering development. It became apparent that in order to overcome these barriers, a number of changes need to take place. A more inclusive approach to stakeholder engagement is required, which facilitates the sharing of knowledge. In order to improve the economic viability of offshore wind in Scotland, adopting a new mechanism which reduces risk and provides developers and investors with more certainty, would be more effective in encouraging offshore wind development. Finally, in order to overcome the most significant barrier, the grid, a more integrated and collaborative approach is required, which will share the burden of responsibility between the developer, Ofgem, and the National Grid. (c) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3711 / 3721
页数:11
相关论文
共 46 条
[2]  
[Anonymous], PREV WIND ADV UK OFF
[3]  
[Anonymous], DIG UK EN STAT 2010
[4]  
[Anonymous], EUR OFFSH WIND IND K
[5]  
[Anonymous], 2009, UK REN EN STRAT
[6]   The 'social gap' in wind farm siting decisions: Explanations and policy responses [J].
Bell, D ;
Gray, T ;
Haggett, C .
ENVIRONMENTAL POLITICS, 2005, 14 (04) :460-477
[7]  
BWEA, 2010, ACT 33GW
[8]  
*DECC, 2009, COST FIN SUPP OFFSH
[9]  
Devine-Wright P, 2009, J COMMUNITY APPL SOC, P1
[10]  
Devine-Wright P, 2010, J ENV PSYCHOL PLACE