Economic Dispatch of Combined Heat and Power Energy Systems Using Electric Boiler to Accommodate Wind Power

被引:45
作者
Liu, Bo [1 ]
Li, Jiang [1 ]
Zhang, Shuo [1 ]
Gao, Manling [2 ]
Ma, Haotian [1 ]
Li, Guoqing [1 ]
Gu, Chenghong [3 ]
机构
[1] Northeast Elect Power Univ, Sch Elect Engn, Jilin 132012, Jilin, Peoples R China
[2] State Grid Shandong Elect Power Co Ltd, Changyi Power Supply Co, Changyi 261300, Peoples R China
[3] Univ Bath, Dept Elect & Comp Engn, Bath BA2 7AY, Avon, England
基金
英国工程与自然科学研究理事会;
关键词
Power generation dispatch; energy storage; wind power generation; thermal analysis; OPTIMAL OPERATION; ALGORITHM; NETWORK; OPTIMIZATION; SIMULATION; PUMPS;
D O I
10.1109/ACCESS.2020.2968583
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is of significant economic value to use an electric boiler to coordinate the heating network and power grid to reduce wind curtailment during heating supply seasons in the north area. This paper presents an optimal economic dispatching model of combined heat and power energy systems to minimize the total operation cost and wind curtailment by using electric boilers. The proposed model comprehensively considers the thermal characteristics of buildings and the constraints of electric and thermal power balancing, combined heat and power (CHP) units, heat storage tanks, electric boiler power, and wind power. To address this model, a linearization optimization model is built, where different dispatch strategies under CHP only, CHP + HST (heat storage tanks), and CHP + HST + EB (electric boiler) different conditions are conducted. Thereafter, the relationship between indoor temperature and thermal power is analyzed with consideration of the temperature time-delay effect and the heat loss on heating balance. A 6-node combined heat and power energy system is used to validate the effectiveness of the proposed model and solution method. Furthermore, the case studies illustrate the impact of heat storage tanks and the electric boiler on wind power curtailment and coal consumption.
引用
收藏
页码:41288 / 41297
页数:10
相关论文
共 30 条
[1]   Optimal placement and sizing of heat pumps and heat only boilers in a coupled electricity and heating networks [J].
Ayele, Getnet Tadesse ;
Mabrouk, Mohamed Tahar ;
Haurant, Pierrick ;
Laumert, Bjorn ;
Lacarriere, Bruno .
ENERGY, 2019, 182 :122-134
[2]   Optimal Configuration of the CHP System Using Stochastic Programming [J].
Benam, Masoud Rezaei ;
Madani, Seyed Sohail ;
Alavi, Seyed Mohammad ;
Ehsan, Mehdi .
IEEE TRANSACTIONS ON POWER DELIVERY, 2015, 30 (03) :1048-1056
[3]   Towards an intermittency-friendly energy system: Comparing electric boilers and heat pumps in distributed cogeneration [J].
Blarke, Morten B. .
APPLIED ENERGY, 2012, 91 (01) :349-365
[4]   Optimal electrical and thermal energy management of a residential energy hub, integrating demand response and energy storage system [J].
Brahman, Faeze ;
Honarmand, Masoud ;
Jadid, Shahram .
ENERGY AND BUILDINGS, 2015, 90 :65-75
[5]   Implications of the modelling of stratified hot water storage tanks in the simulation of CHP plants [J].
Campos Celador, A. ;
Odriozola, M. ;
Sala, J. M. .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (8-9) :3018-3026
[6]   Increasing the Flexibility of Combined Heat and Power for Wind Power Integration in China: Modeling and Implications [J].
Chen, Xinyu ;
Kang, Chongqing ;
O'Malley, Mark ;
Xia, Qing ;
Bai, Jianhua ;
Liu, Chun ;
Sun, Rongfu ;
Wang, Weizhou ;
Li, Hui .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (04) :1848-1857
[7]   Development of wind power industry in China: A comprehensive assessment [J].
Dai, Juchuan ;
Yang, Xin ;
Wen, Li .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 97 :156-164
[8]   Dispatch Model of Combined Heat and Power Plant Considering Heat Transfer Process [J].
Dai, Yuanhang ;
Chen, Lei ;
Min, Yong ;
Chen, Qun ;
Hu, Kang ;
Hao, Junhong ;
Zhang, Yiwei ;
Xu, Fei .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2017, 8 (03) :1225-1236
[9]   Transient simulation of a storage floor with a heating/cooling parallel pipe system [J].
Flores Larsen, Silvana ;
Filippin, Celina ;
Lesino, Graciela .
BUILDING SIMULATION, 2010, 3 (02) :105-115
[10]   Optimal operation for integrated energy system considering thermal inertia of district heating network and buildings [J].
Gu, Wei ;
Wang, Jun ;
Lu, Shuai ;
Luo, Zhao ;
Wu, Chenyu .
APPLIED ENERGY, 2017, 199 :234-246