Machine learning-integrated 5D BIM informatics: building materials costs data classification and prototype development

被引:16
作者
Banihashemi, Saeed [1 ]
Khalili, Saeed [2 ]
Sheikhkhoshkar, Moslem [3 ]
Fazeli, Abdulwahed [3 ]
机构
[1] Univ Canberra, Canberra, ACT, Australia
[2] Bana Yar Mehraz Iranian Co, Tehran, Iran
[3] Iran Univ Sci & Technol, Tehran, Iran
关键词
Building information modelling; 5D BIM; Machine learning; Cost estimation standard; NEURAL-NETWORK; CONSTRUCTION; ANFIS; DIAGNOSIS; PROJECTS; MLP; RBF;
D O I
10.1007/s41062-022-00822-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Non-informatics cost estimation is a tedious process and requires substantial amount of time and manual operations. However, BIM adoption approaches have attracted significant attention with this respect. Since BIM models are object-based with built-in parametric information, it is easier to capture the quantities of building elements and deliver more accurate estimates with less errors and omissions. As most of the current cost estimation standards are designed and developed based on old-fashioned construction project delivery systems, a lack of compatibility between their classification and BIM-based informatics is observed. This study, therefore, aims to develop an informatics framework to integrate a cost estimation standard with BIM in order to expedite the 5D BIM process and enhance the digital transformation practices in construction projects. The developed framework is considered to be a new approach which can automatically estimate the cost of building elements using machine learning-integrated algorithms and MATLAB engine for its effective implementation.
引用
收藏
页数:25
相关论文
共 60 条
[1]   Design information extraction from construction specifications to support cost estimation [J].
Akanbi, Temitope ;
Zhang, Jiansong .
AUTOMATION IN CONSTRUCTION, 2021, 131
[2]   Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system [J].
Akbari, Saeed ;
Pour Rahimian, Farzad ;
Sheikhkhoshkar, Moslem ;
Banihashemi, Saeed ;
Khanzadi, Mostafa .
CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (04) :545-567
[3]   Prediction of Output Energies for Broiler Production Using Linear Regression, ANN (MLP, RBF), and ANFIS Models [J].
Amid, Sama ;
Gundoshmian, Tarahom Mesri .
ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2017, 36 (02) :577-585
[4]  
[Anonymous], 2016, ESTIMATOR
[5]  
Bademosi FM, 2019, COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, P48
[6]   A computer-based cost prediction model for institutional building projects in Nigeria An artificial neural network approach [J].
Bala, Kabir ;
Bustani, Shehu Ahmad ;
Waziri, Baba Shehu .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2014, 12 (04) :518-529
[7]   Real-Time Interaction and Cost Estimating within Immersive Virtual Environments [J].
Balali, Vahid ;
Zalavadia, Ajay ;
Heydarian, Arsalan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (02)
[8]  
Banihashemi S, 2022, DATA CENTRIC REGENER
[9]  
Banihashemi S, 2017, ACTIVE BIM ARTIFICAL
[10]  
Banihashemi S, 2015, RICS COBRA 2015