An integer programming approach to scheduling in a contaminated area

被引:15
作者
Sawik, Tadeusz [1 ]
机构
[1] AGH Univ Sci & Technol, Dept Operat Res & Informat Technol, PL-30059 Krakow, Poland
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2010年 / 38卷 / 3-4期
关键词
Scheduling; Integer programming; Parallel processors; Start time dependent processing time; Contaminated area; DETERIORATING JOBS; TIME; MINIMIZE; MODEL;
D O I
10.1016/j.omega.2009.08.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a time-indexed integer programming formulation for scheduling dependent jobs executed by a team of workers in an area contaminated with radio-active or chemical materials. The dynamics of the harmful factor and the norms of organism recovery imply that each work period for a job should be immediately followed by a rest period for the worker executing this job and the length of the rest period depends on the start time of the corresponding work period. The problem is modeled as an NP-hard problem of scheduling on unrelated parallel processors with start time dependent processing times and different objective functions: maximum or total completion time and maximum or total tardiness. The special case of scheduling jobs executed by a single worker is also considered. Numerical examples and some computational results are reported. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:179 / 191
页数:13
相关论文
共 25 条
[1]  
Alidaee B, 1999, J OPER RES SOC, V50, P711, DOI 10.2307/3010325
[2]   Scheduling start time dependent jobs to minimize the total weighted completion time [J].
Bachman, A ;
Cheng, TCE ;
Janiak, A ;
Ng, CT .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (06) :688-693
[3]   Minimizing the total weighted completion time of deteriorating jobs [J].
Bachman, A ;
Janiak, A ;
Kovalyov, MY .
INFORMATION PROCESSING LETTERS, 2002, 81 (02) :81-84
[4]  
Barketau MS, 2007, DECISION MAKING MANU, V1, P25
[5]   SCHEDULING DETERIORATING JOBS ON A SINGLE PROCESSOR [J].
BROWNE, S ;
YECHIALI, U .
OPERATIONS RESEARCH, 1990, 38 (03) :495-498
[6]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13
[7]   Scheduling jobs with piecewise linear decreasing processing times [J].
Cheng, TCE ;
Ding, Q ;
Kovalyov, MY ;
Bachman, A ;
Janiak, A .
NAVAL RESEARCH LOGISTICS, 2003, 50 (06) :531-554
[8]  
Eisberg R., 1985, QUANTUM PHYS ATOMS M
[9]   QUANTITATIVE MODELS FOR OPTIMAL REST PERIOD SCHEDULING [J].
GENTZLER, GL ;
KHALIL, TM ;
SIVAZLIAN, BD .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1977, 5 (02) :215-220
[10]  
Gorczyca Mateusz, 2008, Information Systems Architecture and Technology. Model Based Decisions, P65