Evaluating critical failure factors for implementing sustainable lean six sigma framework in manufacturing organization A case experience

被引:63
作者
Swarnakar, Vikas [1 ]
Tiwari, Anil Kr [1 ]
Singh, A. R. [1 ]
机构
[1] Natl Inst Technol, Dept Mech Engn, Raipur, Madhya Pradesh, India
关键词
Sustainability; Lean six sigma (LSS); Sustainable lean six sigma (SLSS) framework; Critical failure factors (CFFs); Total interpretive structural modeling (TISM); MICMAC analysis; GREEN; PERFORMANCE; BARRIERS; ADOPTION; SELECTION; MODEL; ISM; INTEGRATION; PROJECTS; INDUSTRY;
D O I
10.1108/IJLSS-05-2019-0050
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this study is to identify, evaluate and develop a structured model to measure the interrelation between critical failure factors (CFFs) that affects the implementation of the sustainable Lean Six Sigma (SLSS) framework in a manufacturing organization. Further solution approaches have been provided that inhibit those CFFs and help in successful implementation of the framework. Design/methodology/approach To find the interrelation among the selected CFFs and develop a systematic structured model, a total interpretive structural modeling (TISM) approach has been used. A 13-level model for selected CFFs has been formed after the application of the TISM approach. Further classification of CFFs has been performed for a better understanding of their nature through MICMAC analysis. Findings A total of 26 SLSS CFFs have been identified through a detailed study of case organization, various literature reviews and experience of panel experts toward developing a systematic model of CFFs. The solution approach has been provided by panel experts based on their industrial experiences after observing the role of CFFs in the developed model. Based on the analysis, it was found that most dependent and dominant CFFs affect the implementation of the SLSS framework in the case organization. Practical implications - This study helps SLSS practitioners, project managers, decision-makers and academicians of manufacturing industries to a better understanding of the failure factors and their interrelations while implementing the SLSS framework in manufacturing organizations. This study also guides the systematic solution approach which helps in tackling such problems that occurred in manufacturing organizations. Originality/value In this study, the TISM-based structural model of CFFs for implementing the SLSS framework in manufacturing organizations has been proposed which is a very new effort in the area of a manufacturing environment.
引用
收藏
页码:1083 / 1118
页数:36
相关论文
共 88 条
[31]   An empirical study of key success factors for Six Sigma Green Belt projects at an Asian MRO company [J].
Ho, Ying-Chin ;
Chang, Ou-Chuan ;
Wang, Wen-Bo .
JOURNAL OF AIR TRANSPORT MANAGEMENT, 2008, 14 (05) :263-269
[32]   Green, lean, Six Sigma barriers at a glance: A case from the construction sector of Pakistan [J].
Hussain, Kramat ;
He, Zhen ;
Ahmad, Naveed ;
Iqbal, Muzaffar ;
Mumtaz, Syed Muhammad Taskheer .
BUILDING AND ENVIRONMENT, 2019, 161
[33]   Performance effects of early and late Six Sigma adoptions [J].
Jacobs, Brian W. ;
Swink, Morgan ;
Linderman, Kevin .
JOURNAL OF OPERATIONS MANAGEMENT, 2015, 36 :244-257
[34]   A review of application of multi-criteria decision making methods in construction [J].
Jato-Espino, Daniel ;
Castillo-Lopez, Elena ;
Rodriguez-Hernandez, Jorge ;
Canteras-Jordana, Juan Carlos .
AUTOMATION IN CONSTRUCTION, 2014, 45 :151-162
[35]   Lean and green product development: two sides of the same coin? [J].
Johansson, Glenn ;
Sundin, Erik .
JOURNAL OF CLEANER PRODUCTION, 2014, 85 :104-121
[36]  
Kannan G., 2008, International Journal of Management and Decision Making, V9, P163, DOI 10.1504/IJMDM.2008.017198
[37]   Successful implementation of TPS in a manufacturing setting: a case study [J].
Kasul, RA ;
Motwani, JG .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1997, 97 (7-8) :274-+
[38]   Analysing the barriers of lean in Indian coal mining industry using integrated ISM-MICMAC and SEM [J].
Khaba, Sorokhaibam ;
Bhar, Chandan .
BENCHMARKING-AN INTERNATIONAL JOURNAL, 2018, 25 (07) :2145-2168
[39]   Selection of Lean and Six Sigma projects in industry [J].
Kornfeld, Bernard ;
Kara, Sami .
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2013, 4 (01) :4-16
[40]   Implementing the Lean Sigma framework in an Indian SME: a case study [J].
Kumar, M. ;
Antony, J. ;
Singh, R. K. ;
Tiwari, M. K. ;
Perry, D. .
PRODUCTION PLANNING & CONTROL, 2006, 17 (04) :407-423