共 50 条
- [3] Secant method for Unit Commitment with ramp rate constraints 2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 1198 - 1204
- [4] Constraints of Wind Power Ramp Event in Robust Unit Commitment 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
- [5] A Memory Simulated Annealing Method to the Unit Commitment Problem with Ramp Constraints Arabian Journal for Science and Engineering, 2012, 37 : 1021 - 1031
- [6] The Significance of Time Constraints in Unit Commitment Problems IEEE ACCESS, 2024, 12 : 31515 - 31522
- [7] Unit commitment with ramp rate constraints using the simulated annealing algorithm MELECON 2004: PROCEEDINGS OF THE 12TH IEEE MEDITERRANEAN ELECTROTECHNICAL CONFERENCE, VOLS 1-3, 2004, : 845 - 849