Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization

被引:19
作者
Liu, Chaowei [1 ]
Zhao, Chuanyu [1 ]
Xu, Qiang [1 ]
机构
[1] Lamar Univ, Dan F Smith Dept Chem Engn, Beaumont, TX 77710 USA
关键词
Hoist scheduling; Water network synthesis; Energy saving; Optimization; MINLP; Pareto frontier; INTEGER DYNAMIC OPTIMIZATION; NET PRESENT VALUE; NETWORK SYSTEM; FACILITIES; LINE;
D O I
10.1016/j.ces.2011.09.024
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Electroplating industry annually produces numerous plated workpieces for U.S. pillar industries. However, it is also a major environment polluter in forms of wastewater, sludge, and spent solution. Thus, waste source reduction for the electroplating industry is a must. In practice, when productivity and energy use efficiency are also taken into account, the design and operation of an electroplating process become very complicated and need an in-depth study. In this paper, productivity maximization, energy saving, and freshwater/wastewater minimization are simultaneously addressed for the optimal design and operation of electroplating processes, which generates a triple-objective mixed-integer dynamic optimization (MIDO) model. The MIDO model is iteratively solved by a developed methodology to obtain the 3D Pareto frontier of the optimization problem, which provides important technical supports for the design and operation of electroplating processes. The efficacy has been demonstrated with a case study on an electroplating process. Published by Elsevier Ltd. Published by Elsevier Ltd.
引用
收藏
页码:202 / 214
页数:13
相关论文
共 44 条
[1]   Scenario-integrated modeling and optimization of dynamic systems [J].
Abel, O ;
Marquardt, W .
AICHE JOURNAL, 2000, 46 (04) :803-823
[2]   Mixed-integer dynamic optimization I: problem formulation [J].
Allgor, RJ ;
Barton, PI .
COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 (4-5) :567-584
[3]   A BOUNDING SCHEME FOR DERIVING THE MINIMAL CYCLE TIME OF A SINGLE-TRANSPORTER N-STAGE PROCESS WITH TIME-WINDOW CONSTRAINTS [J].
ARMSTRONG, R ;
LEI, L ;
GU, SH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (01) :130-140
[4]   New algorithms for mixed-integer dynamic optimization [J].
Bansal, V ;
Sakizlis, V ;
Ross, R ;
Perkins, JD ;
Pistikopoulos, EN .
COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (05) :647-668
[5]  
BAPTISTE P, 1992, P IEEE INT C ROB AUT, V2, P1139
[6]   Dynamic predictive scheduling of operational strategies for continuous processes using mixed-logic dynamic optimization [J].
Busch, Jan ;
Oldenburg, Jan ;
Santos, Marcella ;
Cruse, Andreas ;
Marquardt, Wolfgang .
COMPUTERS & CHEMICAL ENGINEERING, 2007, 31 (5-6) :574-587
[7]   Global mixed-integer dynamic optimization [J].
Chachuat, B ;
Singer, AB ;
Barton, PI .
AICHE JOURNAL, 2005, 51 (08) :2235-2253
[8]  
CHEN H, 1995, P 1995 INRIA IEEE S, V1, P451
[9]  
CPLEX Optimization Inc., 1995, US CPLEX CALL LIB
[10]   ON THE OPTIMIZATION OF DIFFERENTIAL-ALGEBRAIC PROCESS SYSTEMS [J].
CUTHRELL, JE ;
BIEGLER, LT .
AICHE JOURNAL, 1987, 33 (08) :1257-1270