Interactive Scheduling Decision Support System for ore extraction at a phosphate mine

被引:0
|
作者
Alaoui, Najoua [1 ]
Azzamouri, Ahlam [1 ]
Elfirdoussi, Selwa [1 ]
Fenies, Pierre [1 ,2 ]
Giard, Vincent [1 ,3 ]
机构
[1] Univ Mohammed VI Polytech, EMINES, Ben Guerir 43150, Morocco
[2] Paris II Univ, Pantheon Assas, F-75006 Paris, France
[3] PSL Res Univ, Paris Dauphine, F-75016 Paris, France
关键词
Scheduling; Open-pit mine; Decision Support System (DSS); Graphical user interface; SIMULATION; MODEL;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
as open-pit mines consist in the accumulation of ore layers of different characteristics, their extraction process results from the iteration of a sequence of elementary operations performed on parcels by specialized or multipurpose machines. Medium-term extraction programming consists in deciding the assignment of the available machines over time. This problem is addressed through Discrete Event Simulation implemented in a phosphate mine, taking into account all the extraction constraints to drive the extraction process. This combines an effectiveness criterion (degree of urgency of obtaining certain ore qualities) and an efficiency criterion (machine displacements). While the parameterization used to control simulation quickly produces many technically feasible scenarios, making the final optimal choice is extremely difficult, particularly as one needs to take into account time considerations in extracted ore progressive provisioning and machine use. Our paper describes the bases of a visual decision-support system (DSS), currently under development, which enables the processing of results to compare multiple scenarios and adjust parameterization in order to come up with a good solution. This web-based DSS is coupled to the simulator via a relational database.
引用
收藏
页码:654 / 659
页数:6
相关论文
共 50 条
  • [1] AN INTERACTIVE AUDIT-STAFF SCHEDULING DECISION SUPPORT SYSTEM
    BALACHANDRAN, BV
    ZOLTNERS, AA
    ACCOUNTING REVIEW, 1981, 56 (04): : 801 - 812
  • [2] An interactive decision support system for the resource constrained scheduling problem
    Norbis, M
    Smith, JM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (01) : 54 - 65
  • [3] A VISUAL INTERACTIVE DECISION SUPPORT SYSTEM FOR WORKFORCE (NURSE) SCHEDULING
    BELL, PC
    HAY, G
    LIANG, Y
    INFOR, 1986, 24 (02) : 134 - 145
  • [5] Interactive bicriterion decision support for a large scale industrial scheduling system
    Ioanna Makarouni
    John Psarras
    Eleftherios Siskos
    Annals of Operations Research, 2015, 227 : 45 - 61
  • [6] Interactive bicriterion decision support for a large scale industrial scheduling system
    Makarouni, Ioanna
    Psarras, John
    Siskos, Eleftherios
    ANNALS OF OPERATIONS RESEARCH, 2015, 227 (01) : 45 - 61
  • [7] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [8] Interactive decision support system for planned student scheduling using same-time scheduling in timetable
    Guleria, Sanjeev K.
    Lal, Arvind K.
    MODERN PHYSICS LETTERS B, 2019, 33 (13):
  • [9] TurboRouter: An interactive optimisation-based decision support system for ship routing and scheduling
    Fagerholt K.
    Lindstad H.
    Maritime Economics & Logistics, 2007, 9 (3) : 214 - 233
  • [10] Prototype of an Adaptive Decision Support System for Interactive Scheduling with MetaCognition and User Modeling Experience
    Madureira, A.
    Gomes, S.
    Cunha, B.
    Pereira, J. P.
    Santos, J. M.
    Pereira, I.
    2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC), 2014, : 145 - 150