Scheduling operations at system choke points with sequence-dependent delays and processing times

被引:29
作者
Smith, L. Douglas [1 ]
Nauss, Robert M. [1 ]
Mattfeld, Dirk Christian [2 ]
Li, Jian [2 ]
Ehmke, Jan F. [2 ]
Reindl, M. [2 ]
机构
[1] Univ Missouri, Coll Business Adm, St Louis, MO 63121 USA
[2] Tech Univ Carolo Wilhelmina Braunschweig, Carl Friedrich Gauss Fac, Braunschweig, Germany
关键词
Heuristic; Scheduling; MIP; Transportation service facilities; Simulation; SETUP TIMES; TOTAL TARDINESS;
D O I
10.1016/j.tre.2011.02.005
中图分类号
F [经济];
学科分类号
02 ;
摘要
Transportation service facilities often form system choke points with service rendered to entities from multiple queues that require staging for processing. With an MIP model that accommodates sequence-dependent setup times and processing times, we demonstrate how scheduling can be improved relative to simple rules that impose equity (such as FIFO) or efficiency (such as fastest processing time). Using an efficient heuristic scheduler for problems of this type, we then demonstrate, with simulation, the benefits that can occur from employing the refined scheduling procedure at a series of choke points in a transportation system subject to highly variable seasonal traffic. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:669 / 680
页数:12
相关论文
共 15 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   Job shop scheduling with setup times, deadlines and precedence constraints [J].
Balas, Egon ;
Simonetti, Neil ;
Vazacopoulos, Alkis .
JOURNAL OF SCHEDULING, 2008, 11 (04) :253-262
[4]  
CARROLL JL, 1973, WATERWAY RESOURCES R, V51, P63
[5]   Metamodels for estimating waterway delays through series of queues [J].
Dai, MDM ;
Schonfeld, P .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1998, 32 (01) :1-19
[6]   Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times [J].
Gagné, C ;
Price, WL ;
Gravel, M .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (08) :895-906
[7]   A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times [J].
Gendreau, M ;
Laporte, G ;
Guimaraes, EM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 133 (01) :183-189
[8]   Algorithms for single machine total tardiness scheduling with sequence dependent setups [J].
Gupta, Skylab R. ;
Smith, Jeffrey S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) :722-739
[9]   A hybrid approach for single-machine tardiness problems with sequence-dependent setup times [J].
Lin, S. -W ;
Ying, K. -C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2008, 59 (08) :1109-1119
[10]   Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock [J].
Nauss, Robert A. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :1268-1281