Human-robot collaboration in decentralized manufacturing systems: An approach for simulation-based evaluation of future intelligent production

被引:22
作者
Bochmann, Lennart [1 ,2 ]
Baenziger, Timo [1 ,2 ]
Kunz, Andreas [1 ]
Wegener, Konrad [1 ]
机构
[1] Swiss Fed Inst Technol, Inst Machine Tools & Mfg IWF, Leonhardstr 21, CH-8092 Zurich, Switzerland
[2] Volkswagen Grp, Berliner Ring 2, D-38436 Wolfsburg, Germany
来源
10TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING - CIRP ICME '16 | 2017年 / 62卷
关键词
Flexible manufacturing system (FMS); Planning; Optimisation; Human-robot collaboration; ALGORITHM; LOCATION;
D O I
10.1016/j.procir.2016.06.021
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The development towards decentralized manufacturing systems aims at increased flexibility and robustness by maintaining the level of productivity. In order to meet these requirements, human-robot collaboration is considered as basic framework within future intelligent manufacturing cells. For industrial implementation, the concepts of smart production need to be refined and their benefits have to be quantified. This paper introduces concepts for the design of decentralized manufacturing systems and a detailed simulation-based approach for evaluating the performance of the system. Particularly, the relationships between factory layout planning, production scheduling, and human-robot work distribution are investigated. (C) 2017 The Authors. Published by Elsevier B.V.
引用
收藏
页码:624 / 629
页数:6
相关论文
共 27 条
  • [1] Alami R., 2006, 2006 IEEERSJ INT C I, P1, DOI DOI 10.1109/IROS.2006.6936985
  • [2] Becker H., 2006, HIGH NOON AUTOMOTIVE, V1st
  • [3] A tabu search approach for the flow shop scheduling problem
    Ben-Daya, M
    Al-Fawzan, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) : 88 - 95
  • [4] Bochmann Lennart., 2015, INT J AUTO TECH-JPN, V9, P270, DOI DOI 10.20965/IJAT.2015.P0270
  • [5] BOLTE A, 1994, MODELLE VERFAHREN IN
  • [6] Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
  • [7] Location and layout planning: A survey
    Domschke W.
    Krispin G.
    [J]. Operations-Research-Spektrum, 1997, 19 (3) : 181 - 194
  • [8] Dorndorf U, 2001, J SCHED, V4, P157, DOI 10.1002/jos.073
  • [9] Facility layout problems: A survey
    Drira, Amine
    Pierreval, Henri
    Hajri-Gabouj, Sonia
    [J]. ANNUAL REVIEWS IN CONTROL, 2007, 31 (02) : 255 - 267
  • [10] Francis R.L., 1992, FACILITY LAYOUT LOCA