Economic evaluation of a distribution automation project

被引:24
作者
Su, Chun-Lien [1 ]
Teng, Jen-Hao
机构
[1] Natl Kaohsiung Marine Univ, Dept Marine Engn, Kaohsiung 805, Taiwan
[2] I Shou Univ, Dept Elect Engn, Kaohsiung 840, Taiwan
关键词
customer interruption cost (CIC); distribution automation (DA); economic analysis; feeder automation (FA);
D O I
10.1109/TIA.2007.908192
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To deal with the deregulated challenges in future power system operations, Taiwan Power Company Taipower) has taken a strategic approach to implement an extensive Distribution Automation (DA) project including feeder automation (FA), trouble call management, load management, and remote metering functions in its Tai-Chung District. The project was completed in December 2002. For future extension purposes, Taipower tries to develop a comprehensive generalized step-by-step methodology for the economic evaluation of the DA project. This paper presents the methodology and results for the economic evaluation of the Tai-Chung DA project. The potential benefits of the implemented DA functions are quantified using standard mathematic formulas. An economic evaluation method using value-based analysis and present-worth analysis is performed to identify the most beneficial functions in the Taipower's implemented DA functions. Those DA functions that have great benefits should have high priority to be implemented in other distribution districts. Moreover, to find the candidate feeders for further FA extension, the sensitivity analysis of the benefit/cost ratio with respect to different customer types, feeder loads, feeder lengths, numbers of switch, and failure rates is also conducted. Accordingly, the optimum number of switch can be determined under the expected service reliability. The results and formulas obtained in this paper can also be used for return-of-investment or possible performance measure of the DA systems.
引用
收藏
页码:1417 / 1425
页数:9
相关论文
共 16 条
  • [1] Distribution systems reliability - Lakeland Electric case study
    Boateng, R
    Nguyen, L
    Agarwal, S
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2003 PROCEEDINGS, 2003, : 546 - 550
  • [2] PROSPECTS FOR DISTRIBUTION AUTOMATION AT PACIFIC-GAS-AND-ELECTRIC-COMPANY
    BROWN, DL
    SKEEN, JW
    DARYANI, P
    RAHIMI, FA
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 1991, 6 (04) : 1946 - 1954
  • [3] BUNCH JB, 1984, EL3728 EPRI GEN EL C
  • [4] CHANG JL, 2002, POWER SYSTEM RELIBAI
  • [5] COLLIER CA, 1988, ENG EC COST ANAL
  • [6] Gardner E., 1993, P 37 ANN RUR EL POW
  • [7] GRUENEMEYER D, 2002, P 35 ANN RUR EL POW
  • [8] Plan ahead for substation automation
    Haacke, Steve
    Border, Sam
    Stevens, Dehn
    Uluski, Bob
    [J]. 2003, Institute of Electrical and Electronics Engineers Inc. (01): : 32 - 41
  • [9] *IEEE POW ENG SOC, 1988, EH02808PWR IEEE POW
  • [10] IMPACT OF AUTOMATION ON THE RELIABILITY OF THE ATHENS UTILITIES BOARDS DISTRIBUTION-SYSTEM
    LAWLER, JS
    LAI, JS
    MONTEEN, LD
    PATTON, JB
    RIZY, DT
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 1989, 4 (01) : 770 - 778