A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS

被引:21
|
作者
Zhang, Lihui [1 ]
Zou, Xin [1 ]
Qi, Jianxun [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
关键词
Soft logic; repetitive construction projects; time/cost trade-off; scheduling; LINEAR PROJECTS; MODEL; OPTIMIZATION; ALGORITHM; PATH;
D O I
10.3934/jimo.2015.11.1423
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The discrete time/cost trade-off problem (DTCTP) is commonly encountered in repetitive project scheduling. The current models for this problem assume that logical sequences of activities cannot be changed in different units. However, logical sequences are often changed to shorten the project time and minimize project total cost in many practical situations. This characteristic of repetitive activities is referred to as the soft logic. This paper presents a mixed integer nonlinear programming model that combines the general DTCTP and the concept of soft logic. The execution modes of an activity in different units are also considered. The DTCTP is known to be strongly NP-hard, and the introduction of soft logic makes it even more complex. A genetic algorithm (GA) is proposed to resolve the problem. The effectiveness of the proposed GA is verified using the example of a bridge construction project presented in the previous literature. The model proposed in this paper provides more flexibility to reduce the total cost and time of a repetitive project for the planners.
引用
收藏
页码:1423 / 1434
页数:12
相关论文
共 50 条
  • [21] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [22] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [23] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [24] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
    Kebriyaii, Omid
    Heidari, Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Pavlovskis, Miroslavas
    SYMMETRY-BASEL, 2021, 13 (12):
  • [25] Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1447 - 1456
  • [26] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [27] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [28] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [29] Trade-off between process scheduling and production cost in cyclic flexible robotic cells
    Nejad, Mazyar Ghadiri
    Shavarani, Seyed Mahdi
    Vizvari, Bela
    Barenji, Reza Vatankhah
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 96 (1-4) : 1081 - 1091
  • [30] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697