Optimum region of operation for a 108 MW hydroelectric power station
被引:0
作者:
Rigit, ARH
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaysia Sarawak, Fac Engn, Kota Samarahan 94300, Sarawak, MalaysiaUniv Malaysia Sarawak, Fac Engn, Kota Samarahan 94300, Sarawak, Malaysia
Rigit, ARH
[1
]
Low, TK
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaysia Sarawak, Fac Engn, Kota Samarahan 94300, Sarawak, MalaysiaUniv Malaysia Sarawak, Fac Engn, Kota Samarahan 94300, Sarawak, Malaysia
Low, TK
[1
]
机构:
[1] Univ Malaysia Sarawak, Fac Engn, Kota Samarahan 94300, Sarawak, Malaysia
来源:
PROCEEDINGS OF THE XIX IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND CAVITATION, VOLS 1 AND 2
|
1998年
关键词:
D O I:
暂无
中图分类号:
TH [机械、仪表工业];
学科分类号:
0802 ;
摘要:
Much emphasis on hydraulic turbines used in hydroelectric power plants appears to be directed towards condition evaluation and less attention is directed towards performance monitoring. This paper offers an investigative study that will help operating and maintenance staff at a 108 MW hydroelectric power station to operate the hydraulic Francis turbines at optimum region of operation within the permitted range. The results of the study indicated that for a given energy supply, a small improvement of the turbine efficiency would lead to substantial increase in earnings for the power generating company.