OPTIMIZATION STUDY ON PRODUCTION PROCESSES OF LARGE COMPLEX PROJECTS

被引:0
|
作者
Zhang, Shengping [1 ]
Qi, Shenjun [1 ]
Shan, Liang
Li, Chen
机构
[1] Kunming Univ Sci & Technol, Sch Management & Econ, Kunming 650093, Yunnan, Peoples R China
来源
3RD INTERNATIONAL SYMPOSIUM ON INFORMATION ENGINEERING AND ELECTRONIC COMMERCE (IEEC 2011), PROCEEDINGS | 2011年
关键词
large complex projects; WBS; Fast-tracking; DSM; Branch-bound;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
On the basic of analysis on characteristics of large complex projects, this paper thinks that the optimize production processes of large complex project is necessary, and introduces the following three key technologies- the WBS, the fast-tracking and the branch-bound method, which used to achieve process optimization. The WBS is for process decomposition, the fast-tracking is for logic rearrangement of process, and the branch-bound method is for the cost optimization of the local Process duration estimating.
引用
收藏
页码:440 / 444
页数:5
相关论文
共 16 条
  • [1] DSM-based Complex Aerospace Projects Development Process Design and Optimization
    Xiong, Weitao
    Liu, Can
    Zhao, Qingsong
    Yang, Kewei
    2015 9TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2015, : 409 - 415
  • [2] MODELING DECISIONS IN COMPLEX PROJECTS
    Siyam, Ghadir
    Robinson, Robert Wilson
    Kilpinen, Malia
    DS87-2 PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 17), VOL 2: DESIGN PROCESSES, DESIGN ORGANISATION AND MANAGEMENT, 2017, : 497 - 505
  • [3] Optimization of overlapping activities in the design phase of construction projects
    Dehghan, Reza
    Hazini, Kamran
    Ruwanpura, Janaka
    AUTOMATION IN CONSTRUCTION, 2015, 59 : 81 - 95
  • [4] Information Flow Optimization in Construction Design Projects Based on DSM
    Cai Yi-ping
    Peng Zheng-guang
    You Jian-xin
    2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 1994 - +
  • [5] Activity Flow Optimization and Risk Evaluation of Complex Project
    Dong-yu, Chen
    Wan-hua, Qiu
    Min, Yang
    Mei-yung, Leung
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5196 - +
  • [6] Optimization Model of Information Flow in Power Grid Engineering Construction Projects Based on Improved DSM
    Li, A-yong
    Wei, Li-rong
    2015 5TH INTERNATIONAL CONFERENCE ON IT CONVERGENCE AND SECURITY (ICITCS), 2015,
  • [7] The Collaborative DSM: a new way to handle complex collaborative planning and scheduling processes
    Baudin, Mathieu
    Bonnal, Pierre
    Jean-Michel-Ruiz
    RISK AND CHANGE MANAGEMENT IN COMPLEX SYSTEMS, 2014, : 267 - 276
  • [8] Study on cost allocation method based on WBS for aerospace advanced development projects in China
    Yu, B
    Wu, WW
    Cui, K
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 2223 - 2226
  • [9] Re-sequencing of design processes with activity stochastic time and cost: An optimization-simulation approach
    Abdelsalam, Hisham M. E.
    Bao, Han P.
    JOURNAL OF MECHANICAL DESIGN, 2007, 129 (02) : 150 - 157
  • [10] DMM PARTIONING ANALYSIS FOR DESIGN STUDY PROCEDURE OPTIMIZATION
    Araki, Katsufumi
    PROCEEDINGS OF THE 9TH INTERNATIONAL DSM CONFERENCE, 2007, : 113 - 125