共 50 条
- [31] CONTROL OF DEPOSITS ON INNER SURFACES OF PRIMARY CIRCUIT OF V-1 NUCLEAR-POWER PLANT DURING 1ST REACTOR SHUTDOWN JADERNA ENERGIE, 1982, 28 (03): : 98 - 101
- [34] The Optimized Method and System of Promptly Determining Protective Actions During Multi-reactor Accident of Nuclear Power Plant Based on OIL 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 4637 - 4642
- [36] Removal of Antimony from the Primary Circuit of Pressurized Water Reactor Plants and Performance Results at Philippsburg II Nuclear Power Plant. VGB-Kraftwerkstechnik, 1987, 67 (03): : 288 - 290