Reliability Allocation Method of Production Line Based on Fuzzy Comprehensive Evaluation

被引:0
作者
Li, Guofa [1 ]
Hou, Chao [1 ]
Liu, Guofei [1 ]
Jia, Yuhui [1 ]
Liu, Chang [2 ]
Dong, Jinghua [1 ]
机构
[1] Jilin Univ, Sch Mech Sci & Engn, Changchun 130022, Peoples R China
[2] Pan Asia Tech Automot Ctr, Pudong New Area, Shanghai 201201, Peoples R China
来源
PROCEEDINGS OF THE 2016 3RD INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING, MANUFACTURING TECHNOLOGY AND CONTROL | 2016年 / 67卷
关键词
Production Line; Reliability Allocation; Fuzzy Comprehensive Evaluation; Redundancy Optimization Design;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A fuzzy comprehensive evaluation model was built to allocate the reliability of production line combined with the actual case studies. The production rate was converted to inherent availability in the calculation. Considering the buffer, we corrected the allocation index. Combined the opinion of relevant staff and experts, determined various types of factors and right weight that effect reliability of production line. Finally, simulated the production line and optimized allocation results. Provided allocation strategy to production lines.
引用
收藏
页码:1344 / 1350
页数:7
相关论文
共 8 条
[1]   IAs based approach for reliability redundancy allocation problems [J].
Chen, Ta-Cheng .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 182 (02) :1556-1567
[2]  
Huang C Y, 2004, P 10 IEEE PAC RIM IN
[3]   Reliability allocation and optimization for complex systems [J].
Mettas, A .
ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM - 2000 PROCEEDINGS, 2000, :216-221
[4]  
Pereira R A F, 2004, IEEE PES TRANSM DIST, P1
[5]  
Xiao Tianyuan, 2011, MODELING SIMULATION, P254
[6]   A new dynamic programming method for reliability & redundancy allocation in a parallel-series system [J].
Yalaoui, A ;
Châtelet, E ;
Chu, CB .
IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) :254-261
[7]   Application of genetic algorithm for reliability allocation in nuclear power plants [J].
Yang, JE ;
Hwang, MJ ;
Sung, TY ;
Jin, YH .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 65 (03) :229-238
[8]   Task allocation for maximizing reliability of a distributed system using hybrid particle swarm optimization [J].
Yin, Peng-Yeng ;
Yu, Shiuh-Sheng ;
Wang, Pei-Pei ;
Wang, Yi-Te .
JOURNAL OF SYSTEMS AND SOFTWARE, 2007, 80 (05) :724-735