Risk management mode of construction quality and safety: A case study

被引:0
作者
Zhou Hongbo [1 ]
Lu Xin [1 ]
机构
[1] Tongji Univ, Shanghai 200092, Peoples R China
来源
Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2 | 2007年
关键词
risk management; inherent defect insurance; risk control measures; risk planning;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Based on the more and more construction quality and safety problems resulted from the large quantity of construction projects rapid constructed in Shanghai, the local government pay an important attention to propose the new construction market management mode to decrease the construction risk. The new assurance system of construction quality and safety risk were presented in accordance with the introducing the construction insurance into construction management market considering the three kinds of insurances, namely civil and installation all and third party liability insurance, work labor hazard insurance and inherent defect insurance. According to the case study, the life-cycle risk management practice mode of construction quality and safety was described to implement whole process control of construction project from design to defect liability. The practice results show the new mode play an important role in reducing the construction quality and safety problems and the organization, measures and means of risk management presented are feasible to control construction risk.
引用
收藏
页码:647 / 652
页数:6
相关论文
共 50 条
[41]   Research progress on safety risk management for large scale geotechnical engineering construction in China [J].
Xiong Zi-ming ;
Lu Hao ;
Wang Ming-yang ;
Qian Qi-hu ;
Rong Xiao-li .
ROCK AND SOIL MECHANICS, 2018, 39 (10) :3703-3716
[42]   Aviation Risk Management Strategies Case Study [J].
Elkhweldi, Mansour A. ;
Elmabrouk, Saber Kh. .
2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
[43]   Risk management in construction projects [J].
Szymanski, Pawel .
INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 :174-182
[44]   Risk Management in construction industry [J].
Ehsan, Nadeem ;
Alam, Mehmood ;
Mirza, Ebtisam ;
Ishaque, Azam .
PROCEEDINGS OF 2010 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 9 (ICCSIT 2010), 2010, :16-21
[45]   RISK EVALUATION IN CONSTRUCTION MANAGEMENT [J].
Zimmermann, Josef ;
Eber, Wolfgang ;
Schieg, Martin ;
Pastrana, Norma E. Nino .
5TH INTERNATIONAL SCIENTIFIC CONFERENCE BUSINESS AND MANAGEMENT' 2008, 2008, :241-244
[46]   A novel model for risk management of outsourced construction projects using decision-making methods: a case study [J].
Mahmoudi, Amin ;
Abbasi, Mehdi ;
Deng, Xiaopeng ;
Ikram, Muhammad ;
Yeganeh, Salman .
GREY SYSTEMS-THEORY AND APPLICATION, 2020, 10 (02) :97-123
[47]   Application of risk management plan to technical risks in metro construction: Case study of the Grand Paris Express project [J].
Zhang, Yi .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
[48]   A Novel Fuzzy Expert System for Project Portfolio Risk Management: Case of a Construction [J].
Ali Banihashemi, Sayyid ;
Khalilzadeh, Mohammad .
JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (03) :436-456
[49]   RISK COMMUNICATION AND RISK MANAGEMENT FOR ENSURING FOOD SAFETY - CASE OF E. COLI OUTBREAK [J].
Micovic, Elizabeta .
CRIMINAL JUSTICE AND SECURITY - CONTEMPORARY CRIMINAL JUSTICE PRACTICE AND RESEARCH, CONFERENCE PROCEEDINGS, 2013, :547-561
[50]   Patient safety and risk management [J].
Schrappe, M .
MEDIZINISCHE KLINIK, 2005, 100 (08) :478-485