Optimal random inspection policy with two types of failures

被引:0
|
作者
Mizutani, Satoshi [1 ]
Nakagawa, Toshio [2 ]
机构
[1] Aichi Univ Technol, Dept Media Informat, 50-2 Manori, Nishihazama, Gamagori 4430047, Japan
[2] Aichi Inst Technol, Dept Mkt & Informat Syst, Yakusa, Toyota 4700392, Japan
关键词
random inspection; periodic inspection; optimal policy; two types of failures;
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
This paper considers an optimal random inspection policy with two types of failures. The system is checked at, periodic and random times. The failures are classified into two types: Type-1 failure is detected by periodic inspection or random inspection. On the other hand, type-2 failure is detected only by random inspection. However, the cost for one check of random inspection is higher than that of periodic inspection. For example, random inspections are done when the system has finished the successive tasks. Introducing the loss cost elapsed between a, failure and its detection, we obtain the expected cost, and derive analytically optimal interval of periodic inspection which minimizes the expected cost. Numerical examples are given when the times to failure and between random inspections are exponential distribution.
引用
收藏
页码:226 / +
页数:2
相关论文
共 50 条
  • [1] The preventive maintenance and inspection policy for the system with two types of failures
    School of Economics and Management, Yanshan University, Qinhuangdao, Hebei
    066004, China
    不详
    066004, China
    Int J Inf Manage Sci, 3 (307-322):
  • [2] Optimal Inspection and Replacement Strategy for Systems Subject to Two Types of Failures with Adjustable Inspection Intervals
    马晓洋
    王文彬
    刘学娟
    彭锐
    JournalofShanghaiJiaotongUniversity(Science), 2017, 22 (06) : 752 - 755
  • [3] Optimal inspection and replacement strategy for systems subject to two types of failures with adjustable inspection intervals
    Ma X.
    Wang W.
    Liu X.
    Peng R.
    Ma, Xiaoyang (maxiaoyang0218@163.com), 1600, Shanghai Jiaotong University (22): : 752 - 755
  • [4] Optimal maintenance-policy for a system with preventive repair and two types of failures
    Zheng, Zhibin
    Zhou, Wenhui
    Zheng, Yanfang
    Wu, Yongzhong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 102 - 112
  • [5] Optimal maintenance policy for the δ-shock model which has two types of failures
    Yue, De-Quan
    Gao, Qiao-Qiao
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (08): : 2113 - 2119
  • [6] OPTIMAL INSPECTION POLICY WITH 2 TYPES OF IMPERFECT INSPECTION PROBABILITIES
    KAIO, N
    OSAKI, S
    MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 935 - 942
  • [7] The Ordering and Replacement Policy for the System with Two Types of Failures
    Gao Qiaoqiao
    Yue Dequan
    Zhao Bing
    JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2018, 31 (06) : 1541 - 1553
  • [8] The Ordering and Replacement Policy for the System with Two Types of Failures
    GAO Qiaoqiao
    YUE Dequan
    ZHAO Bing
    Journal of Systems Science & Complexity, 2018, 31 (06) : 1541 - 1553
  • [9] The Ordering and Replacement Policy for the System with Two Types of Failures
    Qiaoqiao Gao
    Dequan Yue
    Bing Zhao
    Journal of Systems Science and Complexity, 2018, 31 : 1541 - 1553
  • [10] Optimal maintenance policy for a multi-state deteriorating system with two types of failures under general repair
    Kim, Michael Jong
    Makis, Viliam
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (01) : 298 - 303