Single machine group scheduling with learning effects and past-sequence-dependent setup times

被引:12
作者
Low, Chinyao [1 ]
Lin, Wen-Yi [1 ]
机构
[1] Natl Yunlin Univ Sci & Technol, Inst Ind Engn & Management, Dept Ind Management, Yunlin, Douliou, Taiwan
关键词
single-machine; time-dependent; learning effect; group scheduling; SPT rule;
D O I
10.1080/00207721003731629
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In most studies, the learning effect model applied in a scheduling problem assumes that the actual processing time of a job is a function of its scheduled position or the sum of the normal processing times of the jobs already scheduled. In this article, we introduce a learning effect model and a past-sequence-dependent (psd) setup time into a single machine group scheduling problem. The actual processing time of a job in each group is a function of the sum of the normal processing times of the jobs already scheduled and the position of the corresponding job group in the sequence. It shows that the addressed problem remains polynomially solvable for the objectives: minimisation of the makespan and the total completion time. It also shows that the smallest processing time rule provides the optimal jobs sequence in each group and the optimal group sequence for the addressed problem, respectively.
引用
收藏
页码:1 / 8
页数:8
相关论文
共 50 条
[31]   Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning [J].
Wang, Xiao-Yuan ;
Wang, Jian-Jun .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) :4905-4914
[32]   SINGLE-MACHINE PAST-SEQUENCE-DEPENDENT SETUP TIMES SCHEDULING WITH RESOURCE ALLOCATION AND LEARNING EFFECT [J].
Zhu, Zhanguo ;
Chu, Feng ;
Yu, Yugang ;
Sun, Linyan .
RAIRO-OPERATIONS RESEARCH, 2016, 50 (4-5) :733-748
[33]   Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times [J].
Cheng, T. C. E. ;
Lee, Wen-Chiung ;
Wu, Chin-Chia .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) :1861-1867
[34]   Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times [J].
Huang, Xue ;
Li, Gang ;
Huo, Yunzhang ;
Ji, Ping .
OPTIMIZATION LETTERS, 2013, 7 (08) :1793-1804
[35]   Single machine scheduling problems with truncated learning effects and exponential past-sequence-dependent delivery times [J].
Wang, Xiao-Yuan ;
Lv, Dan-Yang ;
Ji, Ping ;
Yin, Na ;
Wang, Ji-Bo ;
Qian, Jin .
COMPUTATIONAL & APPLIED MATHEMATICS, 2024, 43 (04)
[36]   Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times [J].
Xue Huang ;
Gang Li ;
Yunzhang Huo ;
Ping Ji .
Optimization Letters, 2013, 7 :1793-1804
[37]   Bi-Criterion Single Machine Scheduling Problem with a Past-Sequence-Dependent Setup Times and Learning Effect [J].
Chen, S. H. ;
Mani, V. ;
Chen, Y. H. .
2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, :185-189
[38]   Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects [J].
Hsu, Chou-Jung ;
Kuo, Wen-Hung ;
Yang, Dar-Li .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (03) :1492-1496
[39]   SINGLE MACHINE SCHEDULING PROBLEMS AGAINST DUE DATE WITH THE PAST-SEQUENCE-DEPENDENT SETUP TIMES UNDER LEARNING AND DETERIORATION EFFECTS [J].
Guener, Ertan ;
Toksari, M. Duran .
PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, :1923-1930
[40]   A note on single-machine scheduling with general learning effect and past-sequence-dependent setup time [J].
Lee, Wen-Chiung .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 62 (04) :2095-2100