Disassembly Line Balancing of Electronic Waste Considering the Degree of Task Correlation

被引:4
作者
Cheng, Chen-Yang [1 ]
Chen, Yin-Yann [2 ]
Pourhejazy, Pourya [3 ]
Lee, Chih-Yu [2 ]
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 10608, Taiwan
[2] Natl Formosa Univ, Dept Ind Management, Huwei 63201, Taiwan
[3] UiT Arctic Univ Norway, Dept Ind Engn, Lodve Langsgate 2, N-8514 Narvik, Norway
关键词
waste management; recycling; Disassembly Line Balancing Problem; correlated tasks; optimization; GENETIC ALGORITHM; SEARCH ALGORITHM; OPTIMIZATION; FORMULATIONS; DESIGN;
D O I
10.3390/electronics11040533
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With growing concerns about the depletion of rare-earth elements, managing End-of-Life products has become a key sustainability initiative in the supply chains of global corporations. Recycling, the process of dismantling, separating, and recovery of components and raw materials from wastes, is technologically challenging and should be planned in such a way as to ensure operational efficiency as well as safety. This study explores the Disassembly Line Balancing Problem with Correlated Tasks (DLBP-CT), which is prevalent in the recycling of the Waste of Electrical and Electronic Equipment (WEEE). For this purpose, an original Integer Nonlinear Programming (INLP) model is proposed to find the optimal configuration for the disassembly lines. Given the NP-hard nature of this problem, the Adaptive Genetic Algorithm (AGA) is developed to solve the problem, minimizing the number of workstations and maximizing the relationship between the disassembly tasks. A case example from electronic waste is provided to test the practicality of the developed optimization approach. Sensitivity analysis is conducted to explore the impact of parameter changes in the optimization outcomes. Results are supportive of the applicability of the developed approach and show that it can serve as a strong decision aid tool when selecting the best disassembly process, workstations, and task assignments.
引用
收藏
页数:17
相关论文
共 58 条
  • [1] Alabsi Firas., 2012, Journal of Emerging Trends in Computing and Information Sciences, V3, P1053
  • [2] Profit-oriented disassembly-line balancing
    Altekin, F. Tevhide
    Kandiller, Levent
    Ozdemirel, Nur Evin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (10) : 2675 - 2693
  • [3] A comparison of piecewise linear programming formulations for stochastic disassembly line balancing
    Altekin, F. Tevhide
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (24) : 7412 - 7434
  • [4] Task-failure-driven rebalancing of disassembly lines
    Altekin, F. Tevhide
    Akkan, Can
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 4955 - 4976
  • [5] [Anonymous], EUROSTAT WASTE
  • [6] A New Heuristic for Disassembly Line Balancing Problems with AND/OR Precedence Relations
    Avikal, Shwetank
    Jain, Rajeev
    Yadav, Harish
    Mishra, P. K.
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON SOFT COMPUTING FOR PROBLEM SOLVING (SOCPROS 2012), 2014, 236 : 519 - 525
  • [7] Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    Aydemir-Karadag, Ayyuce
    Turkbey, Orhan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (03) : 413 - 425
  • [8] Disassembly Line Balancing and Sequencing under Uncertainty
    Bentaha, Mohand Lounes
    Battaia, Olga
    Dolgui, Alexandre
    [J]. 21ST CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2014, 15 : 239 - 244
  • [9] Bhandari P., 2020, Responsible Consumption and Production, P349, DOI [10.1007/978-3-319-95726-558, DOI 10.1007/978-3-319-95726-558]
  • [10] Case study analysis of e-waste management systems in Germany, Switzerland, Japan and India A RADAR chart approach
    Chaudhary, Karishma
    Vrat, Prem
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2018, 25 (09) : 3519 - 3540