Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times

被引:9
作者
Anjana, V. [1 ]
Sridharan, R. [1 ]
Kumar, P. N. [2 ]
机构
[1] Natl Inst Technol Calicut, Dept Mech Engn, Calicut 673601, Kerala, India
[2] Indian Inst Management Kozhikode, Quantitat Methods & Operat Management, Calicut 673570, Kerala, India
关键词
Permutation flow shop; Sequence-dependent setup time; NSGA II; Discrete particle swarm optimisation; Variable neighbourhood search; OPTIMIZATION ALGORITHM; WEIGHTED TARDINESS; 2-MACHINE FLOWSHOP; GENETIC ALGORITHM; HYBRID ALGORITHM; COMPLETION-TIME; MILP MODEL; MINIMIZE; JOBS; HEURISTICS;
D O I
10.1007/s10951-019-00610-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Industries such as textiles, paints, chemicals, paper, drugs and pharmaceuticals operate as flow shops with sequence-dependent setup times (SDST). The sequence-dependent setup environment is characterised by the dependence of the setup time on the current job and also on the previous job processed on that machine. To further complicate the problem, in most real-life scenarios, decision-makers have to optimise more than one performance measure while scheduling jobs on machines. This work considers such a multi-objective SDST flow shop environment. The objectives considered in the present study are minimisation of makespan and minimisation of mean tardiness. Four metaheuristics, viz. non-dominated sorting genetic algorithm (NSGA) II, hybrid NSGA II, discrete particle swarm optimisation and hybrid discrete particle swarm optimisation, belonging to the category of intelligent optimisation techniques, are developed to obtain a set of Pareto-optimal solutions. The proposed metaheuristics are applied on benchmark SDST flow shop problems and their performance compared using different measures. Analysis of the results reveals that hybrid NSGA II outperforms the other three algorithms for all problem sizes considered in the present research. The results also indicate that hybridisation of the metaheuristics with variable neighbourhood search improves their performance.
引用
收藏
页码:49 / 69
页数:21
相关论文
共 59 条
  • [1] The third comprehensive survey on scheduling problems with setup times/costs
    Allahverdi, Ali
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 345 - 378
  • [2] Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
    An, Young-Jin
    Kim, Yeong-Dae
    Choi, Seong-Woo
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2016, 71 : 127 - 136
  • [3] [Anonymous], 2006, MULTICRITERIA SCHEDU, DOI DOI 10.1007/B106275
  • [4] [Anonymous], 2005, MULTIOBJECTIVE OPTIM
  • [5] Optimizing memory allocation for multistage scheduling including setup times
    Benoit, Anne
    Coqblin, Mathias
    Nicod, Jean-Marc
    Rehn-Sonigo, Veronika
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (06) : 641 - 658
  • [6] BIANCO L, 1988, NAV RES LOG, V35, P177, DOI 10.1002/1520-6750(198804)35:2<177::AID-NAV3220350203>3.0.CO
  • [7] 2-V
  • [8] Bianco L, 1999, INFOR, V37, P3
  • [9] Scheduling multi-colour print jobs with sequence-dependent setup times
    Burger, A. P.
    Jacobs, C. G.
    van Vuuren, J. H.
    Visagie, S. E.
    [J]. JOURNAL OF SCHEDULING, 2015, 18 (02) : 131 - 145
  • [10] Chaiyaratana N., 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406), P389, DOI 10.1109/CEC.1999.781951