Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM

被引:108
作者
Kim, Kyungki [1 ]
Cho, Yong [2 ]
Zhang, Sijie [3 ]
机构
[1] Univ Houston, Dept Construct Management, 4734 Calhoun Rd 111, Houston, TX 77204 USA
[2] Georgia Inst Technol, Sch Civil & Environm Engn, 790 Atlantic Dr NW, Atlanta, GA 30332 USA
[3] Chevron Energy Technol Co, Houston, TX USA
关键词
Safety; BIM; Scaffolding; Temporary structures; Construction planning; CONSTRUCTION; SYSTEMS; DESIGN; MODELS;
D O I
10.1016/j.autcon.2016.06.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction remains as a hazardous industry that can expose construction workers to fatal accidents and illnesses. With recent advances in BIM technology, project information in BIM can be analyzed in the early design and planning stages to address potential safety issues. However, despite the impact on safety and productivity of the entire construction project, temporary structures, such as formwork and scaffolds, are often omitted from drawings or BIM. In practice, it is challenging to consider temporary structures in current manual jobsite safety analysis which is time-consuming and error-prone. As a result, in construction plans, potential safety hazards related to temporary structures are unknowingly created which need to be identified and prevented during the construction phases. Focusing on scaffolds, this research integrates temporary structures into automated safety checking approach using BIM. A safety planning platform was created to simulate and visualize spatial movements of work crews using scaffolding. Computational algorithms in the platform automatically identify safety hazards related to activities working on scaffolding and preventive measures can be prepared before the construction begins. The algorithms were implemented in a commercially available BIM software as a plug-in and validated with a real-world construction project The results show that the algorithms could identify safety hazards that were not noticed by project managers participating in the case study project The simulated results are visualized in the developed safety planning platform to potentially facilitate early safety communications. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:128 / 142
页数:15
相关论文
共 22 条
  • [1] Automated generation of work spaces required by construction activities
    Akinci, B
    Fischer, M
    Kunz, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04): : 306 - 315
  • [2] [Anonymous], TOP 10 MOST FREQ CIT
  • [3] [Anonymous], Commonly Used Statistics
  • [4] [Anonymous], 2013, CONSTR CHART BOOK
  • [5] Application of geographic information systems in construction safety planning
    Bansal, V. K.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (01) : 66 - 77
  • [6] Linking construction fatalities to the design for construction safety concept
    Behm, M
    [J]. SAFETY SCIENCE, 2005, 43 (08) : 589 - 611
  • [7] BLS, FAT OCC INJ EV EXP F
  • [8] Construction Industry Institute, 2012, PLAYB LEAD IND PRACT
  • [9] An evaluation of scaffold safety at construction sites
    Halperin, KM
    McCann, M
    [J]. JOURNAL OF SAFETY RESEARCH, 2004, 35 (02) : 141 - 150
  • [10] Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
    Jongeling, Rogier
    Kim, Jonghoon
    Fischer, Martin
    Mourgues, Claudio
    Olofsson, Thomas
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (06) : 780 - 791