Production and distribution policy in a two-stage stochastic push-pull supply chain

被引:19
|
作者
Ahn, HS [1 ]
Kaminsky, P
机构
[1] Univ Michigan, Stephen M Ross Sch Business, Ann Arbor, MI 48109 USA
[2] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
关键词
D O I
10.1080/07408170590948477
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a model of a two-stage push-pull production-distribution supply chain. The orders arrive at the final stage according to a Poisson process. Two separate operations, which take place at different locations with exponential service times, are required to convert the raw materials into finished goods. When the first operation is completed the intermediate inventory is held at the first stage and then transported to the second stage where the items are produced to order. The objective is to minimize the average sum of the production, transportation, and holding costs. We consider the optimal policy for a version of this model. Our experimental analysis demonstrates that this optimal policy is counter-intuitive. We develop a heuristic based on a deterministic version of this model, and computationally test the heuristic.
引用
收藏
页码:609 / 621
页数:13
相关论文
共 50 条
  • [1] The Determination of Production and Distribution Policy in Push-Pull Production Chain with Supply Hub as the Junction Point
    Sinaga, A. T.
    Wangsaputra, R.
    4TH ASIA PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS AND THE 3RD INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE, 2018, 319
  • [2] Impact of the pull and push-pull policies on the performance of a three-stage supply chain
    Mahapatra, Santosh
    Yu, Dennis Z.
    Mahmoodi, Farzad
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (16) : 4699 - 4717
  • [3] Improving the push-pull strategy in a serial supply chain by a hybrid push-pull control with multiple pulling points
    Kim, Seung-Hwan
    Fowler, John W.
    Shunk, Dan L.
    Pfund, Michele E.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (19) : 5651 - 5668
  • [4] Optimal inventory control policies of a two-stage push-pull production inventory system with lost sales under stochastic production, transportation, and external demand
    Varlas, George
    Vidalis, Michael
    Koukoumialos, Stelios
    Diamantidis, Alexandros
    TOP, 2021, 29 (03) : 799 - 832
  • [5] On Building a Push-Pull Supply Chain of Iron and Steel Scrap
    Huang, Youheng
    Huang, Zhe
    ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 864-867 : 1959 - 1962
  • [6] Design and construction of a two-stage thermoacoustic electricity generator with push-pull linear alternator
    Hamood, Ahmed
    Jaworski, Artur J.
    Mao, Xiaoan
    Simpson, Kevin
    ENERGY, 2018, 144 : 61 - 72
  • [7] Design of a push-pull transformerless stage
    Generalov, I.P.
    Telecommunications and Radio Engineering (English translation of Elektrosvyaz and Radiotekhnika), 1993, 48 (06): : 135 - 138
  • [8] THE DESIGN OF A PUSH-PULL TRANSFORMERLESS STAGE
    GENERALOV, IP
    TELECOMMUNICATIONS AND RADIO ENGINEERING, 1993, 48 (06) : 135 - 138
  • [9] A Push-Pull Network with Infinite Supply of Work
    Kopzon, Anat
    Nazarathy, Yoni
    Weiss, Gideon
    QUEUEING SYSTEMS, 2009, 62 (1-2) : 75 - 111
  • [10] Two-stage stochastic programming supply chain model for biodiesel production via wastewater treatment
    Marufuzzaman, Mohammad
    Eksioglu, Sandra D.
    Huang, Yongxi
    COMPUTERS & OPERATIONS RESEARCH, 2014, 49 : 1 - 17