A novel time, cost, quality and risk tradeoff model with a knowledge-based hesitant fuzzy information: An R&D project application

被引:41
作者
Mahdiraji, Hannan Amoozad [1 ]
Sedigh, Maryam [2 ]
Hajiagha, Seyed Hossein Razavi [3 ]
Garza-Reyes, Jose Arturo [4 ]
Jafari-Sadeghi, Vahid [5 ]
Dana, Leo-Paul [6 ,7 ]
机构
[1] De Montfort Univ, Leicester Castle Business Sch, Leicester, Leics, England
[2] Khatam Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[3] Khatam Univ, Fac Management & Finance, Dept Management, Tehran, Iran
[4] Univ Derby, Ctr Supply Chain Improvement, Kedleston Rd Campus, Derby DE22 1GB, England
[5] Northumbria Univ, Newcastle Business Sch, Newcastle Upon Tyne, Tyne & Wear, England
[6] Montpellier Business Sch, Montpellier, France
[7] Univ Montpellier, Montpellier, France
关键词
Multi-criteria decision making (MCDM); Multi-objective linear program (MOLP); Hesitant fuzzy linguistic term set (HFLTS); Project management; Time; cost; quality; and risk trade-off (TCQRT); LINGUISTIC TERM SETS; DECISION-MAKING; OFF PROBLEMS; MANAGEMENT;
D O I
10.1016/j.techfore.2021.121068
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper proposes a novel approach for identifying the best implementation situation for each activity in a project by optimizing and balancing time, cost, quality, and risk criteria under uncertain circumstances. A hesitant fuzzy linguistic term set (HFLTS) approach is proposed to determine the status of project activities in the presence of quality and risk criteria alongside time and cost. Afterwards, a multi-objective linear programming (MOLP) model is formulated for time, cost, quality, and risk trade-off (TCQRT). To validate the model, a research and development project in the food industry is investigated. The results indicate that the project's time compared to the deterministic approach was reduced by 20%. Completing the R&D project earlier than other competitors brings a higher profit for the company than trade-off expenses, even without considering the quality and risk trade-off benefits of the proposed approach. Considering uncertainty in the risk and quality of activities in a project via HFLTSs and optimizing all four elements of time, cost, quality, and risk simultaneously are the main values of this research. The proposed approach can be employed by managers to adopt and optimize project planning and scheduling while optimizing the trade-offs among TCQR factors in uncertain circumstances.
引用
收藏
页数:13
相关论文
共 68 条
[61]   The potential link between corporate innovations and corporate competitiveness: evidence from IT firms in the UK [J].
Sukumar, Arun ;
Jafari-Sadeghi, Vahid ;
Garcia-Perez, Alexeis ;
Dutta, Dev Kamal .
JOURNAL OF KNOWLEDGE MANAGEMENT, 2020, 24 (05) :965-983
[62]  
Taghipour M., 2020, Management, V3, P29
[63]   Multiple Objective Social Group Optimization for Time-Cost-Quality-Carbon Dioxide in Generalized Construction Projects [J].
Van-Hiep Huynh ;
Thanh-Hung Nguyen ;
Hai Chien Pham ;
Thi-My-Dung Huynh ;
Thanh-Cong Nguyen ;
Duc-Hoc Tran .
INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2021, 19 (07) :805-822
[64]   Note on entropies of hesitant fuzzy linguistic term sets and their applications [J].
Wei, Cuiping ;
Rodriguez, Rosa M. ;
Li, Peng .
INFORMATION SCIENCES, 2020, 512 :352-368
[65]   Value creation through project risk management [J].
Willumsen, Pelle ;
Oehmen, Josef ;
Stingl, Verena ;
Geraldi, Joana .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (05) :731-749
[66]   FUZZY SETS [J].
ZADEH, LA .
INFORMATION AND CONTROL, 1965, 8 (03) :338-&
[67]   Two-sided matching decision making with multi-granular hesitant fuzzy linguistic term sets and incomplete criteria weight information [J].
Zhang, Zhen ;
Gao, Junliang ;
Gao, Yuan ;
Yu, Wenyu .
EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
[68]   Selection of risk response actions with consideration of secondary risks [J].
Zuo, Fei ;
Zhang, Kailing .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (02) :241-254