The Vehicle Routing Problem with Stochastic Demand and Duration Constraints

被引:72
作者
Erera, Alan L. [1 ]
Morales, Juan C. [2 ]
Savelsbergh, Martin [3 ]
机构
[1] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, Atlanta, GA 30332 USA
[2] BNSF Railway, Ft Worth, TX 76131 USA
[3] CSIRO Math Informat & Stat, N Ryde, NSW 1670, Australia
关键词
vehicle routing; stochastic demand; duration constraints; ALGORITHM;
D O I
10.1287/trsc.1100.0324
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Time considerations have been largely ignored in the study of vehicle routing problems with stochastic demands, even though they are crucial in practice. We show that tour duration limits can effectively and efficiently be incorporated in solution approaches that build fixed, or a priori, tours for such problems. We do so by assuming that each tour must be duration feasible for all demand realizations, and determine the maximum duration of a given delivery tour by solving the optimization problem of an adversary. A computational study demonstrates the approach, and shows that enforcing tour duration limits impacts the structure of nearly-best solutions and may create the need for additional tours. However, for the instances considered, the price paid for robustness is small as the increase in total expected tour duration is modest.
引用
收藏
页码:474 / 492
页数:19
相关论文
共 50 条
[21]   A two-stage stochastic programming method for a heterogeneous vehicle routing problem with time windows and stochastic demand [J].
Zhao, Wencong ;
Zhang, Renqian ;
Luo, Kaiping ;
Wang, Wubin .
EXPERT SYSTEMS WITH APPLICATIONS, 2025, 291
[22]   Mathematical Model for Multi Depot Simultaneously Pick Up and Delivery Vehicle Routing Problem with Stochastic Pick Up Demand [J].
Tasdemir, Beste D. E. S. T. I. C. I. O. G. L. U. ;
Ozyoruk, Bahar .
GAZI UNIVERSITY JOURNAL OF SCIENCE, 2025, 38 (01) :219-235
[23]   Robust vehicle routing problem with deadlines and travel time/demand uncertainty [J].
Lee, C. ;
Lee, K. ;
Park, S. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (09) :1294-1306
[24]   Inventory Routing Problem with Stochastic Demand and Lead Time: State of the Art [J].
Roldan, Raul ;
Basagoiti, Rosa ;
Onieva, Enrique .
INTERNATIONAL JOINT CONFERENCE SOCO'14-CISIS'14-ICEUTE'14, 2014, 299 :73-82
[25]   An investigation into the vehicle routing problem with time windows and link capacity constraints [J].
Ma, Hong ;
Cheang, Brenda ;
Lim, Andrew ;
Zhang, Lei ;
Zhu, Yi .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (03) :336-347
[26]   A branch-and-cut approach for the vehicle routing problem with loading constraints [J].
Hokama, Pedro ;
Miyazawa, Flavio K. ;
Xavier, Eduardo C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2016, 47 :1-13
[27]   An inventory routing problem with stochastic transportation time and demand [J].
Jin, Z. H. ;
You, Q. H. ;
Guan, Z. M. .
Proceedings of the 2005 Conference of System Dynamics and Management Science, Vol 2: SUSTAINABLE DEVELOPMENT OF ASIA PACIFIC, 2005, :689-694
[28]   Truck-drone routing problem with stochastic demand [J].
Wang, Feilong ;
Li, Hongqi ;
Xiong, Hanxi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 322 (03) :854-869
[29]   LOWER BOUNDS FOR A VEHICLE ROUTING PROBLEM WITH MOTION CONSTRAINTS [J].
Manyam, Satyanarayana G. ;
Rathinam, Sivakumar ;
Darbha, Swaroop ;
Obermeyer, Karl J. .
INTERNATIONAL JOURNAL OF ROBOTICS & AUTOMATION, 2015, 30 (03) :207-215
[30]   Minimum Makespan Vehicle Routing Problem with Compatibility Constraints [J].
Yu, Miao ;
Nagarajan, Viswanath ;
Shen, Siqian .
INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING, CPAIOR 2017, 2017, 10335 :244-253