A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine

被引:0
|
作者
Gara-Ali, Ahmed [1 ]
Espinouse, Marie-Laure
机构
[1] Univ Grenoble Alpes, G SCOP, F-38000 Grenoble, France
来源
2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM) | 2015年
关键词
RATE-MODIFYING ACTIVITIES; TOTAL COMPLETION-TIME; AVAILABILITY CONSTRAINT; MAKESPAN; MINIMIZE; SHOP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Simultaneously scheduling jobs and preventive maintenance is a topical subject in the scheduling literature. In this paper, we study a two-machine flow-shop makespan scheduling problem with a deteriorating maintenance period on the second machine, that is, delaying the maintenance increases the time required to perform it. We show that the studied problem is NP-hard and we establish some conditions of the optimal schedule. We also develop a branch and bound (R&B) algorithm to solve this problem. Numerical experiments show that the B&B method can solve large-size instances.
引用
收藏
页码:481 / 488
页数:8
相关论文
共 50 条
  • [41] Scheduling two-machine flow shops with exact delays
    Leung, Joseph Y. -T.
    Li, Haibing
    Zhao, Hairong
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2007, 18 (02) : 341 - 359
  • [42] Two-machine flow shop with dynamic storage space
    Joanna Berlińska
    Alexander Kononov
    Yakov Zinder
    Optimization Letters, 2021, 15 : 2433 - 2454
  • [43] A note on the complexity of flow-shop scheduling with deteriorating jobs
    Thornblad, Karin
    Patriksson, Michael
    DISCRETE APPLIED MATHEMATICS, 2011, 159 (04) : 251 - 253
  • [44] On the optimality conditions of the two-machine flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajji, Mohamed Karim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 426 - 435
  • [45] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs
    Hatem Hadda
    Najoua Dridi
    Sonia Hajri-Gabouj
    4OR, 2010, 8 : 87 - 99
  • [46] Two-machine flow shop with dynamic storage space
    Berlinska, Joanna
    Kononov, Alexander
    Zinder, Yakov
    OPTIMIZATION LETTERS, 2021, 15 (07) : 2433 - 2454
  • [47] Permutation schedules for a two-machine flow shop with storage
    Fung, Joey
    Zinder, Yakov
    OPERATIONS RESEARCH LETTERS, 2016, 44 (02) : 153 - 157
  • [48] Algorithms for a two-machine no-wait flow shop scheduling problem with two competing agents
    Yang, Qi-Xia
    Liu, Long-Cheng
    Huang, Min
    Wang, Tian-Run
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2024, 48 (01)
  • [49] Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
    Gupta, JND
    Koulamas, CP
    Kyparisis, GJ
    Potts, CN
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 171 - 185
  • [50] Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
    Khorasanian, Danial
    Moslehi, Ghasem
    COMPUTERS & OPERATIONS RESEARCH, 2017, 79 : 94 - 108