A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine

被引:0
|
作者
Gara-Ali, Ahmed [1 ]
Espinouse, Marie-Laure
机构
[1] Univ Grenoble Alpes, G SCOP, F-38000 Grenoble, France
来源
2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM) | 2015年
关键词
RATE-MODIFYING ACTIVITIES; TOTAL COMPLETION-TIME; AVAILABILITY CONSTRAINT; MAKESPAN; MINIMIZE; SHOP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Simultaneously scheduling jobs and preventive maintenance is a topical subject in the scheduling literature. In this paper, we study a two-machine flow-shop makespan scheduling problem with a deteriorating maintenance period on the second machine, that is, delaying the maintenance increases the time required to perform it. We show that the studied problem is NP-hard and we establish some conditions of the optimal schedule. We also develop a branch and bound (R&B) algorithm to solve this problem. Numerical experiments show that the B&B method can solve large-size instances.
引用
收藏
页码:481 / 488
页数:8
相关论文
共 50 条
  • [31] Makespan Minimization in Two-Machine Flow-Shop Scheduling under No-wait and Deterministic Unavailable Interval Constraints
    Chen, Kejia
    Li, Debiao
    Wang, Xiao
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2020, 29 (04) : 400 - 411
  • [32] Two-machine no-wait flow shop scheduling with missing operations
    Glass, CA
    Gupta, JND
    Potts, CN
    MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) : 911 - 924
  • [33] A distributionally robust approach for the two-machine permutation flow shop scheduling
    Lu, Haimin
    Pei, Zhi
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 709 - 739
  • [34] Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan
    Toktas, B
    Azizoglu, M
    Köksalan, SK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (02) : 286 - 295
  • [35] Mixed Integer Programming Formulations for Two-Machine Flow Shop Scheduling with an Availability Constraint
    Zhijun Xu
    Dehua Xu
    Jie He
    Qi Wang
    Aihua Liu
    Junfang Xiao
    Arabian Journal for Science and Engineering, 2018, 43 : 777 - 788
  • [36] The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
    Matsveichuk, N. M.
    Sotskov, Y. N.
    Werner, F.
    OPTIMIZATION, 2011, 60 (12) : 1493 - 1517
  • [37] Two-agent scheduling in a two-machine open shop
    Liu, Peihai
    Gu, Manzhan
    Lu, Xiwen
    ANNALS OF OPERATIONS RESEARCH, 2024, 333 (01) : 275 - 301
  • [38] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [39] A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs
    Ng, C. T.
    Wang, J. -B.
    Cheng, T. C. E.
    Liu, L. L.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (01) : 83 - 90
  • [40] Machine scheduling with deteriorating and resource-dependent maintenance activity
    Zhu, Hui
    Li, Min
    Zhou, Zhangjin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 88 : 479 - 486