Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea

被引:11
|
作者
Cha, Hee Sung [1 ]
Shin, Kang Yong [1 ]
机构
[1] Ajou Univ, Dept Architectural Engn, Suwon 443749, South Korea
基金
新加坡国家研究基金会;
关键词
building project; cost performance; quantitative analysis; risk assessment;
D O I
10.3130/jaabe.10.437
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There exists a strong relationship between the level of planning effort and overall project performance. Project stakeholders are concerned about various project objectives among which cost performance has long been regarded as one of the most crucial. Recognizing the lack of a systematic approach in assessing building project risk in association with cost performance prediction, this study identified 49 risk factors from various sources and quantified the relative impact of each factor. By normalizing these values, a Project Risk Score (PRS) has been developed for the purpose of predicting cost performance on a particular project. The 13 real case studies showed a statistically significant relationship between the PRS and cost performance. Predicting cost performance is not simple. Project managers must consider not only factors that are innate to the project, but also project-independent circumstances. This study provides straightforward guidance in assessing a particular project in order to recognize the level of cost performance before project execution. This risk-based performance prediction can improve early-stage project evaluation and enhances the possibility of achieving a sustainable business in a challenging environment.
引用
收藏
页码:437 / 444
页数:8
相关论文
共 35 条
  • [1] Quantitative approach for project performance measurement on building construction in South Korea
    Cha, Hee Sung
    Kim, Chan Kyu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2011, 15 (08) : 1319 - 1328
  • [2] Quantitative approach for project performance measurement on building construction in South Korea
    Hee Sung Cha
    Chan Kyu Kim
    KSCE Journal of Civil Engineering, 2011, 15 : 1319 - 1328
  • [3] Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea
    Hee Sung Cha
    Ki Hyun Kim
    KSCE Journal of Civil Engineering, 2018, 22 : 1614 - 1625
  • [4] Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea
    Cha, Hee Sung
    Kim, Ki Hyun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (05) : 1614 - 1625
  • [5] A quantitative risk assessment development using risk indicators for predicting economic damages in construction sites of South Korea
    Kim, Ji-Myong
    Kim, Taehui
    Son, Kiyoung
    Bae, Junseo
    Son, Seunghyun
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2019, 18 (05) : 472 - 478
  • [6] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [7] Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance
    Rachmawati, Farida
    Mudjahidin, Mudjahidin
    Widowati, Elok Dewi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (02) : 213 - 225
  • [8] ASSESSMENT OF RISK FACTORS AND PROJECT SUCCESS IN CONSTRUCTION INDUSTRY
    Imran, Muhammad
    Hye, A. K. Mahbubul
    Urbanski, Mariusz
    Dacko-Pikiewicz, Zdzislawa
    TRANSFORMATIONS IN BUSINESS & ECONOMICS, 2022, 21 (2B): : 986 - 1000
  • [9] Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry
    Kakar, Ahmad Shah
    Hasan, Abid
    Jha, Kumar Neeraj
    Singh, Amarjit
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024, 22 (05) : 1570 - 1590
  • [10] Impact of Skilled Labor Availability on Construction Project Cost Performance
    Karimi, Hossein
    Taylor, Timothy R. B.
    Dadi, Gabriel B.
    Goodrum, Paul M.
    Srinivasan, Cidambi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)