Zoning Control Technology of Gob-Side Roadway Driving with Small Coal Pillar Facing Mining in a Special Isolated Island Working Face: A Case Study

被引:13
作者
Han, Changliang [1 ]
Yang, Houqiang [1 ]
Zhang, Nong [1 ,2 ]
Deng, Rijian [1 ]
Guo, Yuxin [1 ]
机构
[1] China Univ Min & Technol, Sch Mines, Minist Educ China, Key Lab Deep Coal Resource Min, Xuzhou 221116, Jiangsu, Peoples R China
[2] Jiangsu Normal Univ, Open Lab Large Scale Sci Instruments, Xuzhou 221116, Jiangsu, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 22期
关键词
isolated island working face; face mining; gob-side roadway driving with small coal pillar; partition control; pressure relief anchorage; DEFORMATION; STABILITY; ADJACENT; SYSTEM;
D O I
10.3390/app112210744
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The gob-side roadway in an isolated island working face is a typical representative of a strong mining roadway, which seriously restricts the efficient and safe production of underground coal mines. With the engineering background of the main transportation roadway 1513 (MTR 1513) of the Xinyi Coal Mine, this paper introduces the engineering case of gob-side roadway driving with small coal-pillar facing mining in an isolated island working face under the alternate mining of wide and narrow working faces. Through comprehensive research methods, we studied zoning disturbance deformation characteristics and stress evolution law of gob-side roadway driving under face mining. Based on the characteristics of zoning disturbance, MTR 1513 is divided into three zones, which are the heading face mining zone, the mining influenced zone, and the mining stability zone. A collaborative control technology using pressure relief and anchoring is proposed, and the differentiated control method is formed for the three zones. For the heading face mining zone, the control method of anchoring first and then pressure relief is adopted; for the mining influenced zone, the control idea of synchronous coordination of pressure relief and anchorage is adopted; for the mining stability zone, the control method of anchoring without pressure relief is adopted. Engineering practices show that the disturbance influence distance of working face 1511 on MTR 1513 changes from 110 m advanced to 175 m delay. At this time, the surrounding rock deformation is effectively controlled, which verified the rationality of the division and the feasibility of three zoning control technology. The research results can provide reference for gob-side roadway driving with small coal pillar facing mining in a special isolated island working face.
引用
收藏
页数:18
相关论文
共 22 条
  • [1] Roof Deformation, Failure Characteristics, and Preventive Techniques of Gob-Side Entry Driving Heading Adjacent to the Advancing Working Face
    Bai, Jian-biao
    Shen, Wen-long
    Guo, Guan-long
    Wang, Xiang-yu
    Yu, Yang
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2015, 48 (06) : 2447 - 2458
  • [2] [曹安业 Cao Anye], 2014, [煤炭学报, Journal of China Coal Society], V39, P328
  • [3] Numerical modelling of the effects of weak immediate roof lithology on coal mine roadway stability
    Coggan, John
    Gao, Fuqiang
    Stead, Doug
    Elmo, Davide
    [J]. INTERNATIONAL JOURNAL OF COAL GEOLOGY, 2012, 90 : 100 - 109
  • [4] [窦林名 Dou Linming], 2012, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V31, P453
  • [5] Geng H., 2019, THESIS CHINA U MININ
  • [6] HAN CL, 2017, J CHINA COAL SOC, V42, P323
  • [7] He F. L., 2000, J CHINA COAL SOC, V25, P589
  • [8] Jiang FX., 2015, Chin. J. Rock Mech. Eng, V34, P4164
  • [9] [李佃平 Li Dianping], 2012, [煤炭学报, Journal of China Coal Society], V37, P719
  • [10] Numerical Investigation of the Effect of the Location of Critical Rock Block Fracture on Crack Evolution in a Gob-side Filling Wall
    Li, Xuehua
    Ju, Minghe
    Yao, Qiangling
    Zhou, Jian
    Chong, Zhaohui
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (03) : 1041 - 1058